Jack Lonsdale
2012-Apr-26 21:03 UTC
[R] Using FME modCost with multiple independent variables
I am attempting to calibrate a forest growth model using FME. I have several spatially separate plots with time series growth data for each(eg, height, basal area, etc.). Thus 2 independent variables: time and plot. Is there a way that I can calculate a model cost that takes into account these different plots? I notice in the documentation for the modCost function that there is a note stating that using more than one independent variable should be possible in the future, and was wondering if anyone has managed this? Or if there is a way I can achieve this, it would be interesting to know how. Thanks, Jack -- The University of Edinburgh is a charitable body, registered in Scotland, with registration number SC005336.