Displaying 20 results from an estimated 2000 matches similar to: "HMisc describe -- error with dates"
2004 Apr 22
3
POSIXct vs Dates
I noticed the addition of the Dates class for dates without times, in R
1.9. I am making extensive use of POSIXct at present and would like to
know whether it is worth changing to Dates. What are a few of the
trade-offs?
Thanks,
Frank
---
Frank E Harrell Jr Professor and Chair School of Medicine
Department of Biostatistics Vanderbilt University
2004 Mar 04
10
"Statistiques avec R"
Dear R users,
I want to share my joy with you. Please see the following
excellent introduction to R "Statistiques avec R " by
Vincent Zoonekynd
http://zoonek2.free.fr/UNIX/48_R/all.html
In paticular, you can see a lot of fascinating graphics
examples of R from which you can get many hints.
Soryy if this is already well-known, but the CRAN search
did not show nothing with the keyword
2004 Feb 10
2
confidence-intervals in dotchart
My earlier posting should have said "dotchart", not "barchart".
1) How does one show confidence-intervals in a "dotchart" and use rownames
for labels on the y-axes? I have looked at "plotCI" in "gregmisc" package .
But it does not seem to produce something like a dotchart. The statistic,
error, upper-bound, and lower-bound are in a
2003 Dec 16
16
mailing list for basic questions - preliminary sum up
Dear R-user,
I already received quite a lot of replies to this mail and like to do a
preliminary sum up.
A few were sceptical about the use of such a beginner mailing list.
The arguments were that people starting with R will only stay subscribed for
a short time
until they reached the R-help "level" and therefore only beginner will teach
beginner how to
use R.
But as far
2003 Aug 31
1
Problem installing acepack in debian
In
platform i386-pc-linux-gnu
arch i386
os linux-gnu
system i386, linux-gnu
status
major 1
minor 7.1
year 2003
month 06
day 16
language R
using debian testing (latest Knoppix) I get an error when installing acepack:
gcc
2004 Feb 01
5
Stepwise regression and PLS
Dear all,
I am a newcomer to R. I intend to using R to do stepwise regression and
PLS with a data set (a 55x20 matrix, with one dependent and 19
independent variable). Based on the same data set, I have done the same
work using SPSS and SAS. However, there is much difference between the
results obtained by R and SPSS or SAS.
In the case of stepwise, SPSS gave out a model with 4 independent
2003 May 19
2
upData levels in Hmisc
Dear listserve members, especially Prof. Harrell:
I am trying to create a factor variable that has fewer levels than the
original.
I have a factor:
>rosa$risk1
[1] 2 2 5 1 ...
[1799] 3 3 1 3 1 6 3 3 1 5 3 5 3 3 3 0 3 3 3 1 1 3
Levels: 0 1 2 3 4 5 6 8
But when I do this:
rosa2 <- upData(rosa,
2008 Sep 29
1
describe function in package Hmisc and function format.dates in chron (PR#13087)
Full_Name: Kem Phillips
Version: 2.7.1 (2008-06-23)
OS: Windows Xp professional
Submission from: (NULL) (98.221.200.108)
The Hmisc function describe fails, giving the error message:
Error in formatDateTime(dd, atx, !timeUsed) :
could not find function "format.dates"
Loading the chron package, where function dates apparently resides, does not
fix the problem. Note
2003 Nov 26
6
FDA and ICH Compliance of R
Does anybody know if R is FDA or ICH (or EMEA...) compliant? AFAIK S-Plus
is but that means nothing...
--
Trebate bolji pristup internetu?
Nazovite IskonInternet na 0800 1000 ili pogledajte
http://www.iskon.biz/individualni/usluge/dialup/
2011 Aug 30
3
having trouble extracting week from chron object
Running R 2.13.1 on Windows XP.
I would like to get week of the year (1-52) for each date.
library(chron)
dts <- dates(c("02/27/92", "02/27/92", "01/14/92","02/28/92", "02/01/92"))
dts
dts.chron <- as.chron(dts)
dts.chron
class(dts.chron)
# all of these component extractions work:
months(dts.chron)
weekdays(dts.chron)
years(dts.chron)
2013 May 01
3
Chron format question h:m not working
R 2.12.2 on Scientific Linux 6.4
#works
chron(times.="15:00:00", format=c(times="h:m:s"))
#doesn't work
chron(times.="15:00", format=c(times="h:m"))
From chron Manual:
The times format can be any permutation of "h", "m", and "s" separated
by any one non-special character. The default is "h:m:s".
what am I
2008 Aug 01
1
chron objects: input/output
Hi list, I have some questions regarding
1) conversion of date + time characters to chron
2) formatting chron object printing
Regarding (1), Gabor's Rnews 2004 4/1 article has been indispensible,
but I often work with files where dates and times are contained in a
single field. In this case, I would like to control input/output of
chron objects when each observation of date and time is
2004 Jan 28
5
Julian dates
Hi all,
I have problems with years of dates using "chron" package.
I don't understand why R by this istruction:
> dates("01/02/29",out.format="d/m/year")
[1] 02/Jan/2029
> dates("01/02/30",out.format="d/m/year")
[1] 02/Jan/1930
reads "29" as 2029
and "30" as 1930. How could I change to read "00" to
2002 Oct 18
1
Chron problem with R 1.6.0 (PR#2181)
Full_Name: Rick Bilonick
Version: 1.6.0
OS: Linux (RH 7.1)
Submission from: (NULL) (12.4.226.1)
Hi. I'm using Red Hat 7.1 Linux (Intel 586). I installed the 1.6.0 rpm. No
problems were reported. When I tried to load the chron library:
Error in dyn.load(x, as.logical(local), as.logical(now)) :
unable to load shared library "/usr/lib/R/library/chron/libs/chron.so":
2005 May 17
2
cumsum on chron objects
Hi,
Is there some alternative to cumsum for chron objects? I have data frames
that contain some chron objects that look like this:
DateTime
13/10/03 12:30:35
NA
NA
NA
15/10/03 16:30:05
NA
NA
...
and I've been trying to replace the NA's so that a date/time sequence is
created starting with the preceding available value. Because the number of
rows with NA's following each available
2004 Mar 01
6
Find out the day of week for a chron object?
I know that this is correct:
library(chron)
x = dates("01-03-04", format="d-m-y", out.format="day mon year")
print(x)
It gives me the string "01 Mar 2004" which is correct.
I also know that I can say:
print(day.of.week(3,1,2004))
in which case he says 1, for today is monday.
My question is: How do I combine these two!? :-) I have a
2012 Nov 27
2
Some questions about chron package..
Hello,
I have questions while reviewing "chron" package(e.g.,chron.R).
1. What is the differences between 3 kinds of function definition ?
1) "name" <- function(...
2) 'name' <- function(...
3) name <- function(...
Do you know Why author used various kinds of definitions ?
Is there no functional differences between them ?
2. I
2012 Jun 15
2
time zones and the chron to POSIXct conversion
Hey R folks,
i found some strange (to me) behaviour with chron to POSIXct conversion.
The two lines of code result in two different results, on ewith the
correct time zone, one without:
library(chron)
as.POSIXct(chron('12/12/2000'), tz = 'UTC')
as.POSIXlt(chron('12/12/2000'), tz = 'UTC')
Only the code below would give me a POSIXct object with the correct time
2008 Jul 31
2
S 3 generic method consistency warning please help
I would like to include this in a package. The S3 methods on R CMD check
says
* checking S3 generic/method consistency ... WARNING
window:
function(x, ...)
window.chron:
function(data, day1, hour1, day2, hour2, ...)
See section 'Generic functions and methods' of the 'Writing R Extensions'
manual.
I have looked and can not figure it out. This function is for convience.
What
2004 May 26
3
is.weekend() odd behaviour
It seems is.weekend() is unsure ?
# Start R 1.9.0 with --vanilla on windows xp
# load package chron
> table(is.weekend(sapply(1:100, function(i){Sys.sleep(0.05);Sys.time()})))
FALSE TRUE
68 32
> date()
[1] "Wed May 26 11:18:56 2004"
> version _
platform i386-pc-mingw32
arch i386
os mingw32
system i386, mingw32