search for: enrad

Displaying 6 results from an estimated 6 matches for "enrad".

Did you mean: genrad
2017 Jul 22
2
Compaq R3000h support
On Sat, Jul 22, 2017 at 7:48 AM, Charles Lepple <clepple at gmail.com> wrote: > > I also have not used a Synology device, but as I recall, they generally > expect to be the NUT master system. This may cause problems if you need to > do something fancy with upssched. > The Synology boxes work fine as NUT clients, *however* they provide very little ability to configure NUT
2017 Jul 22
0
Compaq R3000h support
...16]: Connected to UPS [R3000]: upscode2-R3000 Jul 22 17:20:06 BIFROST upsd[10117]: Startup successful Jul 22 17:20:06 BIFROST upsmon[10121]: Startup successful Jul 22 17:20:06 BIFROST upsmon[10122]: Login on UPS [R3000 at localhost] failed - got [ERR ACCESS-DENIED] With best regards [Beskrivning: ENRAD_logo_20K.bmp] Tomas Larsson CTO Enrad AB Verkstadsgatan 10 504 62 Bor?s Office: +46 33 297 550 Direct: +46 33 297 553 www.enrad.se<http://www.enrad.se/> https://youtu.be/Dq9duakIjMU Enrad AB ing?r i Cleantech inn. Kluster f?r h?llbar global utveckling [Beskrivning: Clean Tech Inn]<http://...
2017 Jul 22
3
Compaq R3000h support
Hi List. I have an old Compaq 3000 (Eaton 5119). It is running servers, disk-arrays, one workstation etc. I am planning to install NUT (master) on a headless CENTOS 6.8 system. Connect the UPS with seral cable. Now my main question is, Does NUT support the power segments on the UPS. My intention is to be able to take down the system in an ordered way before the batteries are exhausted. I.e 5 mins
2017 Jul 22
0
Compaq R3000h support
On Jul 22, 2017, at 4:13 AM, Tomas Larsson <tomas.larsson at enrad.se> wrote: > > I am planning to install NUT (master) on a headless CENTOS 6.8 system. > Connect the UPS with seral cable. It looks like this might be using the upscode2 driver (UPScode-II protocol), right? > Now my main question is, Does NUT support the power segments on the UPS....
2017 Aug 03
0
Ã…terkalla meddelande: How do I configure NUT?
Tomas Larsson skulle vilja ?terkalla meddelandet, How do I configure NUT?.
2017 Aug 03
2
How do I configure NUT?
Hi there. I need some advise on how to configure NUT, if it is possible to do it. My UPS, a Compaq R3000 has three individual power segments. I want NUT to: When mains is interrupted. Shut down all serves immediately. When all servers are completely down, in sequence with time delay shut down two of the power segments. When batteries is about to be depleted shut down itself and the last power