Displaying 20 results from an estimated 100 matches similar to: "[HCL] Cyber Power Systems CP600LCD supported by usbhid-ups"
2011 Jan 21
2
Cyber Power USB UPS'.
Greetings:
I'm evaluating two replacements for UPS upgrades to my dept. Because
the CyberPower OP650 has been retired, we are evaluating the
CyberPower600VA and the CyperPower 1000AVRLCD. We will be evaluating
others.
Initial configuration and communications are established via the
usbhid-ups driver, the gambit of tests are all passed with the
exception of one. I seem to be failing
2018 Oct 15
0
UPS BZ1500PBI-BR (Microsol - Brazil) Compatibility.
Hello,
I've been trying to set this UPS up on a Synology NAS DS218+ which uses
NUT, and even though they are using NUT, they don't have all drivers
available as NUT has them at NUT's website.
Please see that below:
root at DSAltaCloud:/usr/syno/etc/ups# upsdrvctl start
Network UPS Tools - UPS driver controller
DSM6-2-1-newmodel-repack-23796-180722
Network UPS Tools - Generic HID
2017 Sep 19
2
Bug or feature? polling frequency = (pollfreq + pollinterval)
Hi,
Context of my question:
* OS name and version,
Synology's distributed Linux: Linux DS 3.10.102 #15152 SMP Fri Sep 1
11:15:03 CST 2017 x86_64 GNU/Linux
* exact NUT version,
Tricky... the installed tools display:
$ /usr/sbin/upsd -V
Network UPS Tools upsd DSM6-1-15114-170518
while the one I've compiled, and its not running, displays:
$ /opt/sbin/upsd -V
Network UPS Tools upsd
2005 Jul 18
0
Authentification problem?
Greetings;
I have been trying to set Samba on the latest release of Fedora to share some
files on my office network. Here is my smbd.conf file:
#======================= Global Settings =====================================
[global]
workgroup = Maison
server string = Linux
netbios name = Linux
encrypt passwords = yes
wins support = yes
[data]
path = /data
browseable = yes
2020 Aug 06
0
Synology NAS is shutting down Ubuntu servers after very brief power outage (fwd)
Ok guys,
So we just had a storm roll through and of course we lost power for just a split second. This time I was actually home for it. Sure enough, the servers shutdown and wouldn’t boot all the way up until I restarted my Synology. I grep’d the syslog and here’s the results:
> proton at proton:~$ sudo grep upsmon /var/log/syslog
> Aug 6 19:19:09 proton upsmon[1552]: UPS ups at
2018 Mar 10
2
UPS CYBERPOWER CP1300EPFCLCD MISSING FROMCOMPATIBILITY LIST
Hi
I have just purchased a Cyberpower CP1300EPFCLCD UPS.
It is not listed in your Compatibility List
http://networkupstools.org/stable-hcl.html
I am very new to all this but do have a background in IT. I have been
retired for 18 years so am a bit out of touch so please excuse if I am a bit
fuzzy.
I will try my best to explain my issue below.
When I plug my UPS into my Synology NAS
2007 Dec 03
0
Cyber Timer(cybermanager)
Hi all,
Am setting up a internet cyber cafe of roughly 50 or
so boxes running on CentOS 5.0.
Now the question is. Does someone on the list know of
a open source cyber timer/cybermanager which runs on
CentOS(LINUX) and where i can download it? All that am
getting are M$ based.(grrrh).
Thanks.
-------------------------------------------------
David Maina.
Systems/Network Administrator.
PdE-Kenya.
2010 Apr 19
0
Cyber Power 1000AVR LCD issue
I'm currnetly using NUT 2.4.3 to monitor a Cyber Power 1000AVRLCD UPS. I
found the following in the mailing list archive:
http://lists.alioth.debian.org/pipermail/nut-upsdev/2010-March/004673.html
and I want to inform the list that I had to apply the same patch to libhid.c
in order to monitor that UPS.
-spc
2013 Nov 22
0
[HCL] CyberPower LE825G supported by Cyber Power Systems ups 2 685AVR USB (usbhid-ups) driver
CyberPower Battery Backup with Surge Protection, model LE825G
Appears to function properly with the driver listed on the HCL for the
Cyber Power Systems ups 2 685AVR USB (usbhid-ups).
Tested with shutdown mode "UPS Goes On Battery" with a 5 second timer
and the system successfully shutdown as expected.
upsc output:
upsc ups
battery.charge: 100
battery.charge.low: 10
2016 Nov 24
0
[HCL] CyberPower Cyber Power Systems CP685AVR supported by usbhid-ups
[please use Reply-All - this list does not modify the reply-to header]
> On Nov 23, 2016, at 10:30 AM, Craig STCR <craig.stcr1 at gmail.com> wrote:
>
> It looks like the CyberPower Cyber Power Systems CP685AVR supported by
> usbhid-ups has a favorable device dump linked to the Devices Dumps
> Library page here:
>
>
2017 Sep 13
0
[HCL] Cyber Power UPS LX1500GU supported by driver usbhid-ups
Cyber Power UPS Model LX1500GU
*upsc output:*
root at freenas:~ # upsc ups at localhost
battery.charge: 100
battery.charge.low: 10
battery.charge.warning: 20
battery.mfr.date: CPS
battery.runtime: 5670
battery.runtime.low: 300
battery.type: PbAcid
battery.voltage: 24.0
battery.voltage.nominal: 24
device.mfr: CPS
device.model: LX1500GU
device.serial: QAKGP2000252
device.type: ups
driver.name:
2016 Dec 09
0
[HCL] Cyber Power Systems EC750G supported by usbhid-ups
On Dec 8, 2016, at 1:34 PM, Mike wrote:
>
> I didn't want to sign up for the nut-devs list or create a git account
> just to provide this information, so I hope posting this info here is OK...
Not a problem. (Both lists go into the same mailbox on my end.) The important part is the "HCL" subject so I can find it later.
For anyone else who runs across this: you don't
2017 May 21
0
[HCL] Cyber Power Systems CP1500AVRLCDa supported by usbhid-ups
Mike,
Thanks for the info. I have enough to add an entry to the DDL, but I have a few more questions inline.
On May 14, 2017, at 1:21 PM, Mike wrote:
>
> [updated]
>
> OpenBSD 6.1/amd64
> NUT 2.7.4p0 (from OpenBSD package)
>
>
> Results of upsc:
>
> battery.charge: 100
> battery.charge.low: 10
> battery.charge.warning: 20
> battery.mfr.date: CPS
Let
2017 Jun 05
0
[HCL] Cyber Power Systems CP1500AVRLCDa supported by usbhid-ups
On Jun 5, 2017, at 11:21 AM, Mike <the.lists at mgm51.com> wrote:
>
> Result of the command, where "n" is incremented in a loop:
>
> # usbconfig -u 1 -a 2 dump_string n
> STRING_0x00 = 0x04, 0x03, 0x09, 0x04
> STRING_0x01 = <CP1500AVRLCDa>
> STRING_0x02 = <CTHGN200xxxx>
> STRING_0x03 = <CPS>
> STRING_0x04 = <PbAcid>
>
2024 Mar 08
1
Cyber Power System CP1500 AVR UPS: changing battery.charge.low value
On Mon, 4 Mar 2024, Alan C. Bonnici via Nut-upsuser wrote:
> Platform: Proxmox VE 8.1.4
> NUT version: Network UPS Tools upsstats 2.8.0
>
> I configured Proxmox and I can pull up the UPS stats.
> Typing in `upsrw -l cyberpower at localhost` I get the following:
>
> [battery.charge.low]
> Remaining battery level when UPS switches to LB (percent)
> Type: STRING
>
2024 Mar 10
0
Cyber Power System CP1500 AVR UPS: changing battery.charge.low value [ups.delay.start sidebar]
Thanks Charles for the clarification.
If NUT cannot control it then removing it would, IMO add value.
On Sun, 10 Mar 2024 at 00:14, Charles Lepple <
clepple_at_gmail.com_chribonn at duck.com> wrote:
> On Mar 9, 2024, at 5:16?PM, chribonn at duck.com wrote:
> >
> > The posting at
> https://github.com/networkupstools/nut/issues/432#issuecomment-405371395
> references
2024 Mar 10
1
Cyber Power System CP1500 AVR UPS: changing battery.charge.low value [ups.delay.start sidebar]
Very good point. I hope to write a beginners guide -- more like adopting
my notes --on NUT.
I could summarise your point that technically one should only override
settings that NUT can act upon (like those settings that control Low
Battery or, as stated in the documentation if the reported value is known
to be incorrect. Overriding a variable that is out of scope for NUT (as
with
2024 Mar 10
0
Cyber Power System CP1500 AVR UPS: changing battery.charge.low value [ups.delay.start sidebar]
Wow :-) I'll have a read through it.
On Sun, 10 Mar 2024 at 15:54, Roger Price <
roger_at_rogerprice.org_chribonn at duck.com> wrote:
> On Sun, 10 Mar 2024, Alan via Nut-upsuser wrote:
>
> > Very good point. I hope to write a beginners guide -- more like
> adopting my
> > notes --on NUT.
>
> I did the same thing, 131 pages, at
>
2017 Mar 02
0
[HCL] Cyber Power Systems EC750G supported by usbhid-ups [UPS.Output.DelayBeforeShutdown]
On Dec 9, 2016, at 11:14 AM, Mike <the.lists at mgm51.com> wrote:
>
> On 12/8/2016 10:37 PM, Charles Lepple wrote:
>> On Dec 8, 2016, at 1:34 PM, Mike wrote:
>>> The result of the command
>>>
>>> upscmd -u user -p password myups load.off.delay 300
>>>
>>> is an immediate power-off, no delay.
>>
>> Hmm. Certainly
2024 Mar 09
1
Cyber Power System CP1500 AVR UPS: changing battery.charge.low value [ups.delay.start sidebar]
On Mar 9, 2024, at 5:16?PM, chribonn at duck.com wrote:
>
> The posting at https://github.com/networkupstools/nut/issues/432#issuecomment-405371395 references ups.delay.start and suggests setting it to -1.
>
> upsrw -l pve1 at localhost listed this as modifiable but any attempt at modifying the value failed. I used the override.ups.delay.start = -1 in nut.conf and this is now being