Displaying 20 results from an estimated 1000 matches similar to: "Asterisk registering problem"
2005 Feb 07
1
Provider with GA DIDs and LNP
Hi,
I am looking for a provider that can provide DIDs in Atlanta, GA (national
in future) and who can port an existing number. LiveVoip is a perfect fit
but doesn't do LNP :-(.
Currently I only need a handful of numbers ported, but will have more
requirement in future. I'll need unlimited simultaneous incoming/outgoing
calls (can pay for incoming as well).
Any pointers are much
2007 Apr 06
12
Verizon-Vonage Lawsuit
May be slightly off topic, but I was wondering what everyone thinks of this
latest ruling against Vonage? Does anyone really know what Verizon hold
patents for, and could those patents possible affect anything in Asterisk?
Who knows who Verizon will go after next.
Brent
-------------- next part --------------
An HTML attachment was scrubbed...
URL:
2008 Aug 12
1
LNP Problems
What is the deal with "CSR's"?
TWTelecom is telling me that I can't port a number to their service
without a Customer Service Record. Apparently this is easy with
Verizon, and not so easy with some other companies.
Basically I'm at a brick wall with a couple of ports because TWTelecom
is telling me I HAVE to get a CSR and certain other providers (Time
Warner Cable for
2005 Jan 04
6
OT: List of VoIP providers?
I have been looking around for VoIP providers but have not found a good
listing.
Is there no "yellow pages" for VoIP providers? Google mostly returns
services
like Vonage, Packet8, NuFone, ect. None seam to be very reseller
friendly and
none offer LNP or local DID's for my area. Anyone know of a list (even a
partial one)
Jeromie Reeves
2014 Mar 25
1
Dovecot Port 993 and 995 not connecting.
Hello Mates,
I am facing a really weird issue with my mail server, somehow I cannot
connect using port 993.
It works with 143 but not 993 nor 995.
Here is a little bit of more information:
# telnet localhost 143
Trying ::1...
telnet: connect to address ::1: Connection refused
Trying 127.0.0.1...
Connected to localhost.
Escape character is '^]'.
* OK [CAPABILITY IMAP4rev1 LITERAL+
2004 Aug 19
2
Floating point exception help
Hi Manfred,
I applied the patch and recompiled and reinstalled and I got the folowing
warning during my first test call:
Aug 19 12:26:51 WARNING[294927]: dsp.c:1234 __ast_dsp_silence: zero length
packet
It looks like that could be the problem... and the fix! I'll let you know if
the problem reoccurs. Might it be an idea to submit the patch to the
bugtracker?
Thanks,
Gary
----- Original
2007 Feb 19
1
Urgent: How to obtain the Consistent Standard Errors after apply 2SLS through tsls() from sem or systemfit("2SLS") without this error message !!!!!!!!!!!!!
Hi,
I am trying to obtain the heteroskedasticity consitent standard errors
(HCSE) after apply 2SLS. I obtain 2SLS through tsls from package sem or
systemfit:
#### tsls ####
library (sem)
Reg2SLS <-tsls(LnP~Sc+Ag+Ag2+Var+R+D,~I2+Ag+Ag2+Var+R+D)
summary (Reg2SLS)
#### systemfit ####
library (systemfit)
RS <- LnP~Sc+Ag+Ag2+Var+R+D
Inst <- ~I2+Ag+Ag2+Var+R+D
labels
2001 Jul 21
2
ChallengeResponseAuthentication - typos and inconsistancies?
Hi,
It seems from the source code that there are a couple of quirks
with this option:
firstly, in the code it's mis-spelt as
"challenge_reponse_authentication"
and secondly, the default for the client (in readconf.c) seems to be
off, whereas for the server (servconf.c) seems to be on:
readconf.c: if (options->challenge_reponse_authentication == -1)
readconf.c:
2007 Jan 27
1
gsub regexp question
Dear R Users,
I am trying to users gsub to remove multiple cases of square brackets and their different contents in a character string. A sample of such a string is shown below. However, I am having great difficulty understanding regexp syntax. Any help is greatly appreciated.
Ally
"tree STATE_286000 [&lnP=-12708.453945423369] = [&R]
2006 May 09
2
read.table (Error in file(file, "r") : unable to open connection)
G?day,
I am trying to read in a table and am getting an error message stating that R is unable to open a connection to the file.
? Avonvegen<- read.table("Y:\Study Sites\Avon\nonspatial\datafiles\archive\Avon_VegEnh.dat ", sep=",", na.string="-9999", header=TRUE)
Error in file(file, "r") : unable to open connection
In addition: Warning message:
cannot
2018 Nov 05
4
classicupgrade
On Mon, 5 Nov 2018 13:50:09 +0100
Corrado Ravinetto via samba <samba at lists.samba.org> wrote:
>
>
> Il 05/11/2018 13:24, Rowland Penny via samba ha scritto:
> > It sounds like you do not want your users to log into the DC, so I
> > would remove the libnss_winbind links on the DC, this will not
> > affect authentication from the DC.
> sorry for my english,
2007 May 09
5
Mobile Number to Mobile carrier mapping
Hi Folks,
Is there a way to find out the mobile/landline carrier name based on the
phone number?
For example, who is the mobile carrier for (415)2345678
I had heard about some query but just don't remember how/what?
Thanks in advance.
Ritesh
-------------- next part --------------
An HTML attachment was scrubbed...
URL:
2006 Jan 28
1
PR#8528
On 23/02/05 I suggested that given R had included TOMS 708 to correct for t=
he=20
poor performance of pbeta, TOMS 654 should be included to fix all the pgamm=
a=20
problems. I was slightly surprised to find Morten's code had been included=
=20
instead 2 days later. I noticed but did not worry that the reference to me =
had=20
been removed.=20
The derivation of the asymptotic expansion for
2005 Mar 06
1
Re: [Asterisk-biz] Livevoip U.S. 800 LNP Starts March 9th 2005
Mike,
No they have not. Calls are failing again today. They have offered to
refund my money but that does not solve the problem. My asterisk server
is only 4 to 12 ms away from their "network". I have had VERY good luck
with nufone.(40 to 45ms away) Only have 1 or 2% fail rate. Going to be
calling txlink.net on Monday.
Seems that LiveVoIP does not care about asterisk users. They like
2017 May 16
2
Golang CertChecker hostname validation differs to OpenSSH
On Wed, May 17, 2017 at 2:46 AM, Damien Miller <djm at mindrot.org> wrote:
> On Mon, 15 May 2017, Adam Eijdenberg wrote:
>> https://github.com/golang/go/issues/20273
>>
>> By default they are looking for a principal named "host:port" inside
>> of the certificate presented by the server, instead of just looking
>> for the host as I believe OpenSSH
2006 Mar 17
2
samba and mac clients
On my network, when a mac client tries to access a windows share, they
are presented with a dialog box, prompting them for the share to connect
and then the authentication credentials.
However, when a mac client tires to connect to a samba share, it
immediately receive a dialog box with the error: "Could not connect to
the sever because the name or password is not correct.".
Does
2020 Feb 11
2
Cannot turn iommu on inside guest
So I want to turn iommu support on in a guest ( <type arch='x86_64'
machine='pc-q35-4.1'>hvm</type>). Per [1] I tried to add to devices
either
<devices>
<iommu model='intel'>
<driver intremap='on'/>
</iommu>
</devices>
or just a simpler
<devices>
<iommu model='intel /'>
</devices>
2007 Apr 26
1
Asterisk Voice sound level
Hi,
Is there a possibility to control sound levels (higher / lower) in Asterisk
(so the codecs). Somebody asked me to evaluate that but I didn`t found any
documentation about. I have the opinion that for these (audio) things the end
user client is the only part where I can tune around.
Problem is for example a (Austria) ISDN --> Asterisk --> SIP / IP --->
(Romania) Asterisk
2008 Mar 04
4
Mitel SX-200 + *
Does anyone have any experience getting a Mitel SX-200 EL/ML PBX system
to work with *?
I'm not getting inbound or outbound calls to work. (Inbound caller gets
line busy tone.)
SETTINGS FROM MITEL:
I built a Crossover cable and connected it like this:
PSTN--T1--ASTRISK--T1--OLD MITEL
-Crossover Cable Pin-out:
1 - 4
2 - 5
2008 Jan 02
2
Asterisk dialplan date and time operations
Hi all,
Im using Asterisk 1.4.11 and I want to proceed some time and date operations
in my dial plan. (for a time shifted callback).
Should look like:
CURRENT TIME + x minutes.
Of course it should increase the hours for example in this case:
10.59 + 5 minutes = 11.04
I guess I've to use the math function in 1.4 but how can I manage easily the
time operations?
Kind Regards,
Erik