Displaying 20 results from an estimated 100 matches similar to: "Asterisk register ip phone"
2006 Feb 19
1
Cisco 7960 Register Problem
Hi all
I have a problem to register a cisco 7960 to an asterisk 1.2.2
I defined in sip.conf the next :
["phonenumber"]
type=friend
username="username"
secret="password"
host=dynamic
context=work
I am trying to catch the register requests with
sip debug
with no success (empty screen).
I can only catch the register messages with ngrep on host it's comming
2009 Feb 11
2
OPTIONS packets
Hi all,
I need to register asterisk on an OpenSIPS SIP Proxy...The Registration is
OK but my asterisk is sending OPTIONS packets to OpenSIPS and the SIP Proxy
is not replying back...The issue is the UNKNOWN username that reside in the
OPTIONS packet as you can see in the captured packets as you can see below:
1. U Asterisk_IP:5060 -> OPENSIPS_IP:5060
2. OPTIONS sip:OPENSIPS_IP
2004 Sep 12
0
RE: No subject by Steve M
Just responding in case this may be of help to somebody with firewalling
issues. Not sure if this is off on a tangent to the original
question...
Here are three different forms of common firewall scripts and ways of
getting SIP to work behind them. The third one has some additional
stuff beyond just SIP although I can't remember why I wrote it that way.
I've been having no fun using
2007 Oct 17
1
Portscans and Asterisk
Anything to do about portscans? Is there any way (should I) to see
if the connection is a legit (only SIP currently) connection BEFORE
my * answers?
[2007-10-17 19:23:46] WARNING[4191]: chan_sip.c:6624 determine_firstline_parts: Bad request protocol 01@<ASTERISK_IP> SIP/2.0
-- Executing [s at default:1] Answer("SIP/sip.jmg.se-081dd730", "") in new stack
[2007-10-17
2010 May 07
0
SIP REGISTER header not containing Allow-Events or Allow
The SIP trunking service that I am trying to set up keeps saying that my
registration from Asterisk is invalid.
Asterisk registration:
REGISTER sip:{registration_ip} SIP/2.0
Via: SIP/2.0/UDP {asterisk_ip}:5060;branch=z9hG4bK5c2eb10c;rport
Max-Forwards: 70
From: <sip:{registration_user}@{registration_ip}>;tag=as5579cc0c
To: <sip:{registration_user}@{registration_ip}>
Call-ID:
2008 Dec 15
3
tcpdum
*Dear All,
I run the below tcp dump on my asterisk server
tcpdump -i eth0 -n -s0 -v udp port 5060
I got the following result
20:29:48.596867 IP (tos 0x10, ttl 64, id 0, offset 0, flags [DF], proto 17,
length: 373) SIP_PROXY_IP.5060 > Asterisk_IP.5060: UDP, length 345
What i need to know please what TTL means specifically and what is the best
value og TTL and what is the lengh vale mean
2013 Jan 23
1
DPMA and Sending fake auth rejection for device
Greetings all,
After a long day of fighting with GTalk and having it finally working, I
wanted to setup DPMA on my Digium phone.
So first of all, I had to reinstall it all and reconfigure it all, since
it works only on certified versions, and my installation was not from
the certified branch. It took a long time of recompiling, testing,
adding missing stuff, but I got it straight.
Now, I
2009 Mar 20
1
T38 FAX
Dear All,
I'm trying to send FAX to an endpoint Behind NAT...The scenario i the
following:
PSTN_GW-->Asterisk-->asterisk-->OpenSIPS-->Endpoint behind NAT..
The FAX is failed and I got the following error log on asterisk:
Mar 20 09:21:09] WARNING[20388]: chan_sip.c:12409 handle_response_invite:
Re-invite to non-existing call leg on other UA. SIP dialog
2004 Oct 07
3
Vmail & Snom 190s
Hi all,
I got a couple of Snom 190's through this week and after some initial
foolishness I have them both setup no problems.
But here comes the except.
When there is voicemail waiting the softbutton appears but the phone
always dials its own extension. No matter what I put into the "mailbox"
parameter on the line settings. (Phone registers correctly with * and
all standard
2005 Feb 25
0
Asterisk with PortaOne Radius client- problem in accounting script with OH323
Dear all,
I have installed asterisk 1.0.5 on redhat 9
I have installed also, asterisk-oh323 0.6.5 module (successfully
compiled and installed)
Now When I am trying to get asterisk communicate with a Radius (in my
case: it's the VoiceMaster Radius)
I was able to do the following:
After installing all recommended to download and install radius client
for asterisk
2005 Mar 02
1
IVR setup problems
Hi guys still have the problem to setup the IVR correctly.
I am forwarding call from ser :
if (method == "INVITE") {
if (uri =~ "sip:1[0-9]{10}@*"){
log(1, "Forwarding to Asterisk\n");
rewritehostport("xxx.xxx.xxx.xxx:5061");
t_relay();
break;
}
}
inside sip.conf
2008 Nov 06
1
rsync + cifs problem
hello,
I'm trying to use a remote SMB/CIFS share to backup a local directory
tree. I use rsync "version 3.0.4 protocol version 30" and mount.cifs
"1.10" with a kernel 2.6.18. The directory I'm trying to backup is quite
big and has a lot of files inside.
[root@linux dir]# du -hs .
50G .
[root@linux dir]# find . -type f | wc -l
41929
I get the following error when
2005 Mar 24
1
realtime - unable to find key
ok so my table looks like this...
REATE TABLE `sip` (
`id` int(11) NOT NULL auto_increment,
`name` varchar(80) NOT NULL default '',
`accountcode` varchar(20) default NULL,
`amaflags` varchar(7) default NULL,
`callgroup` varchar(10) default NULL,
`callerid` varchar(80) default NULL,
`canreinvite` char(3) default 'yes',
`context` varchar(80) default NULL,
`defaultip`
2005 May 25
13
Cisco 7960 Firmware help please.
Was in the process of upgrading a 7960 to SIP and in advertently applied
a skinny image (P003G302.bin), now no matter what i put in OS79XX.TXT
and OS7960.TXT it simply wont upgrade. The phone is pulling down
OS79XX.TXT from my TFTP server but then goes on to repetedly ask for
SEP<MACaddr>.cnf.
Help!!
-------------- next part --------------
An HTML attachment was scrubbed...
URL:
2010 Jan 27
2
astdb
Hi, all
What is the use of astdb?
Is it used to store realtime values like sip etc.
Regards,
Bhrugu Mehta
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://lists.digium.com/pipermail/asterisk-users/attachments/20100127/b13d6a62/attachment.htm
2009 Jun 25
1
SIP registration fails
Asterisk-server behind Endian-firewall: SIP-aware, 5060 + RTP-ports
opened and 5060 forwarded to Asterisk (192.168.2.2)
Can someone see why SIP-registration fails ??
register => 092779077:XXXX at 85.119.188.3
[3starsnet]
type=peer
host=85.119.188.3
username=092779077
secret=XXXX
fromuser=092779077
fromdomain=sip.3starsnet.com
dtmfmode=rfc2833
canreinvite=no
insecure=port,invite
qualify=yes
2001 Mar 25
0
Marking at egress? (DiffServ)
Hi all,
Supposedly my router is itself streaming traffic to clients. Is it possible
for it to mark its packets before going through dsmark??
I have gone through the examples in iproute2/examples, i noticed that
there''s always an ingress and egress of which these are 2 different dev. Is
it possible for before ingress and egress be the same dev??
I tried the script below but
2010 Aug 18
3
Wrong disk size problem.
Hi,we have Centos 5.4 server and according to me we have strange problem.
Disk size and other indormation like below.Normally,md2 partition
should have 46GB free disk size but available value is zero.Why it
show zero ? If you help me,I will be happy.
df -h
Filesystem Size Used Avail Use% Mounted on
/dev/md1 19G 2.1G 16G 12% /
/dev/md2 880G 834G 0
2020 Mar 27
0
Wine release 5.5
The Wine development release 5.5 is now available.
What's new in this release (see below for details):
- Builtin libraries use the new UCRTBase C runtime.
- Compatibility mode used when reporting Windows version.
- Better support for debug information in PE files.
- Support for linguistic case mappings.
- More attributes supported in WebServices.
- Various bug fixes.
The source
2019 Mar 03
0
Wine release 3.0.5
The Wine maintenance release 3.0.5 is now available.
What's new in this release (see below for details):
- Various bug fixes
The source is available from the following locations:
https://dl.winehq.org/wine/source/3.0/wine-3.0.5.tar.xz
http://mirrors.ibiblio.org/wine/source/3.0/wine-3.0.5.tar.xz
Binary packages for various distributions will be available from: