Displaying 1 result from an estimated 1 matches for "todmin".
Did you mean:
tadmin
2008 Aug 19
0
R-code: for those who like a challenge; HELP
...ettings in Sub Saharan Africa. I have 50 surveys with
- crude mortality rate (cmr), CMR lower confidence interval(cmrlci), CMR upper confidence interval(cmruci),
- recall period minimum and recall period maximum (recallmin, recallmax)
- time of displacement mimimum and time of displacement maximum (todmin, todmax)
- population data at time of survey and proportion of population present in camp over time of displacement (data[9] - data[170])
Because of the uncertainty in these variables I am using the Monte Carlo method with e.g. 10,000 iterations and am writing a function that can run through each...