Displaying 1 result from an estimated 1 matches for "real_dat".
Did you mean:
real_dst
2003 Jan 13
1
Fw: Plotting text-string real_date names at excel_date positions.
...of the plotted data.
The second column is a text-string of date. This should be what is posted
(instead of the excel_date).
The third column is the chemical data and this should be the position of a
point on the y-axis.
A line needs to connect the points but should break at the NA.
excel_date real_date chemical
36234 15-Mar-99 1.6
36302 22-May-99 0.195
36395 23-Aug-99 4.9
36475 11-Nov-99 NA
36593 8-Mar-00 3.58
Rex