Displaying 10 results from an estimated 10 matches for "litr".
Did you mean:
ltr
2006 Oct 27
1
barcharts with 2 different axes
Dear UseRs,
I'm having trouble drawing a barchart with 2 quantities in different units
as follows with
one unit on the top axis and the other unit on the bottom. E.g.,
x Tonnes | .
. .
Row 1 Tonnes1 | xxxxxxxxxx
Row 1 Litres1 | yyyyyyy
Row 2 Tonnes1 | xxxxxxxxxxxxxxxxxxxxx
Row 2 Litres1 | yyyyyyyyyyyyyyyy
y Litres | .
. .
Can anybody provide an example please?
Cheers,
Geoff Russell
[[alternative HTML version deleted]]
2009 Aug 25
1
Fw: Re: Simulating data for sampling (stupid question)
...)
Combined Average Buying
Proportions of total buying
1
50
31000
1550000
19.9100835
2
200
13500
2700000
34.6820809
3
350
4500
1575000
20.2312139
4
1000
600
600000
7.70712909
5
3400
400
1360000
17.4694926
Total
5000
50000
7785000
100
L/M =litres per month
This means I have to simulate 50 outlets of type 1 who buy between say 20000 and 40000 L/M, 200 outlets of type two buying 12000 – 19999 L/M,… etc. Also I have to simulate ratings randomly from 1 to 10.
I really do not know how to simulate data, after simulating I am going...
2009 Apr 13
4
Physical Units in Calculations
Back in 2005 I had been doing most of my work in Mathcad for over 10 years.
For a number of reasons I decided to switch over to R. After much effort and
help from you folks I am finally "thinking" in R rather than thinking in
Mathcad and trying to translating to R. Anyway, the only task I still use
Mathcad for is calculations that involve physical quantities and units. For
example, in
2009 Aug 25
0
Fw: Re: Simulating data (stupid question)
...)
Combined Average Buying
Proportions of total buying
1
50
31000
1550000
19.9100835
2
200
13500
2700000
34.6820809
3
350
4500
1575000
20.2312139
4
1000
600
600000
7.70712909
5
3400
400
1360000
17.4694926
Total
5000
50000
7785000
100
L/M =litres per month
This means I have to simulate 50 outlets of type 1 who buy between say 20000 and 40000 L/M, 200 outlets of type two buying 12000 – 19999 L/M,… etc. Also I have to simulate ratings randomly from 1 to 10.
I really do not know how to simulate data, after simulating I am going t...
2002 May 02
0
Request: Please incorporate Hideaki Gotos Watchdog patch into OpenSSH
...o stay connected to any outside servers
at all, because the proxy's timeout is about 30 seconds.
Please incorporate this patch into OpenSSH proper -- it's very very useful.
I'm sure there are plenty of people in the same situation that would benefit
from it.
regards,
Peter Lowe.
--
Litres of beer drunk in the Czech Republic so far this year: 5923793.26
http://yoyo.org/~pgl/beer/
2007 Mar 20
0
Open New orders from Asia Sourcing
...or Of Motorcycle, ... (1000 pcs) from IN
http://asia-sourcing.net/wbid.html?bid=167590
Buy Seaweed Slimming Soap (1000) from GM
http://asia-sourcing.net/wbid.html?bid=167589
Buy Motherboard (1200) from TR
http://asia-sourcing.net/wbid.html?bid=167588
Buy N Methyl Ketopyrrolidine (50 litres) from TN
http://asia-sourcing.net/wbid.html?bid=167587
Buy High-grade Silicon-carbide Abrasive Material, ... (###) from IT
http://asia-sourcing.net/wbid.html?bid=167586
Buy High-grade Silicon-carbide Abrasive Material, ... (###) from IT
http://asia-sourcing.net/wbid.html?bid=16758...
2011 Nov 02
1
Lattice plots and missing x-axis labels on second page
Hello,
I'm trying to make a lattice plot (using xyplot()). I have included a
"layout=c(3,4)" statement, giving me 12 plots per page and an
"as.table=TRUE" statement, directing the way the plots are laid out. I
have 18 plots altogether and so 6 of them end up on the second page.
Everything looks fine for the first page, but the x-axis labels (e.g.
1993, 1994...) are all
2012 Jan 15
1
Trouble installing packages on R2.14.1
...M)
Telephone 07 5451 2267 Mobile 0413 490 985 Facsimile 07 5451 2260
Email Mark.Crawford@derm.qld.gov.au
www.derm.qld.gov.au
+----------------------------------------------------------------+
Think B4U Print
1 ream of paper = 6% of a tree and 5.4kg CO2 in the atmosphere
3 sheets of A4 paper = 1 litre of water
+----------------------------------------------------------------+
[[alternative HTML version deleted]]
2004 Jun 13
4
*** Asterisk Sunday News: Off track with 1.0, moving forward
Thank you very much for all feedback on Asterisk Sunday News!
This is the last issue for June. This week I'll go on holiday
and will be back with more news in early July.
My kids are getting summer leave this week and we'll be
visiting the south of England for a while. Another part of
Europe that still use their own currency.
If you think there's an European standard, you're
2003 Mar 02
8
OT: PRI costs in US
Hello!
Several of my customers would like to add a backup to their Internet
connection. ISDN is a good solution: decently fast for a dial-up-type
connection, yet still faily affordable. While I was at it, I decided to
look at a couple of more creative telephone service options to possibly
improve their service or lower costs at the same time. These customers
range from having just a