2013 Apr 22
0
Fwd: Not receiving real data from a Eaton E series DX 1000H UPS
On 18.4.2013 ?. 22:24 ?., Arnaud Quette wrote: > > 2013/4/18 Pladi Computers Ltd. <pladi at lovechnet.com > <mailto:pladi at lovechnet.com>> > > UPS: > http://www.eaton.com/Eaton/ESeriesUPS/DXUPS/index.htm?wtredirect=www.eaton.com/DXUPS > > I have the same problem on two different computers. The first one > is running Ubuntu 12.10 i386 , the
2013 Apr 18
4
Not receiving real data from a Eaton E series DX 1000H UPS
UPS: http://www.eaton.com/Eaton/ESeriesUPS/DXUPS/index.htm?wtredirect=www.eaton.com/DXUPS I have the same problem on two different computers. The first one is running Ubuntu 12.10 i386 , the second one is running Debian 6.0 x64. Both of them are updated. I tried using different serial cable but the result is the same. The connection to the ups using Windows 7 and Winpower is working fine on
2005 Dec 19
1
MGE Pulsar ES 8+
Hi! I have a MGE Pulsar ES 8+ UPS. Here is the response of some commands: - Si --> 3000 44 0 - Si 1 --> Pulsar ES8+ 0 - Ai --> 5 0 It's not recognized very well by the current (from CVS) mge-utalk driver: [root@srv01 ~]# /home/rog/src/nut/drivers/mge-utalk -i 20 -DDD -u root /dev/ttyS0 Network UPS Tools - MGE UPS SYSTEMS/U-Talk driver 0.86 (2.1.0) debug level is '3'
2013 Apr 02
3
blazer driver: Possible bugs with battery packs
Hello all, long time away from this list, glad to be around again! I have this Powercom Vanguard VGN VGD-20K31. Some details of this model: * 3-phase input, single phase output * Model has 240V / 12V9AH x 20 x 2SET, plus another set of 20 batteries. All in all, 3 sets * Serial connection to Windows 2k3 server with UPSMon Now I was strongly considering replacing the bundled no-good upsmoon
2018 Jul 31
0
Adding drivers to NUT?
Dear Daniele, I have some news regarding the Driver: I applied the patch you sent me (https://github.com/zykh/nut/tree/issue-441) and it works correctly (obviously in Level 5 of Debug I see "missing CR...etc.."). As for now there are 2 modification I'd like to suggest you: - For Online Type UPSs the Megatec protocol describes that the battery voltage is provided in the form of V
2006 May 11
2
APC Backups Pro Low Batt
It there a way to get the genericups driver to set a output on the serial port? On the APC BackupPro the will pull the BattLow line low with a pull down resistor it's up to you to from the PC side to pull the line high with a pullup resistor from one of the RS232 output pins. Then monitor the line with another pin. Regards Rabie -------------- next part -------------- An HTML attachment was
2018 Aug 28
1
Fwd: Forward of moderated message
[forwarded without attachments, for real this time] > Begin forwarded message: > > From: Gabriele TAORMINA <gabriele.taormina at legrand.com <mailto:gabriele.taormina at legrand.com>> > Subject: Re: [Nut-upsdev] Adding drivers to NUT? > Date: August 27, 2018 at 6:03:55 AM EDT > To: Daniele Pezzini <hyouko at gmail.com <mailto:hyouko at gmail.com>> >
2018 Jul 26
5
Adding drivers to NUT?
Dear Daniele, nice to meet you, I'm a collegue of Gabriele. The problem with "blazer_usb" driver ("blazer_ser" works correctly) is related to the following commands: - "F" and "I": when the KRAULER subdriver check these UPS answers it uses wrong constants to check the lenght of the received packets, so these commands are considered as "not
2023 May 16
1
Synthesize low batt (LB) fron SNMP UPS which does not support this?
Hi, after ignoring this for too long (see [1]), I'm still struggling how to shut down servers fed by two independent UPS systems. Both are connected to NUT via the snmp-ups driver with mibs "huawei" and "netvision". However, I fear both do not feature the LB warning via ups.status. We can shut down all less important servers (conencted to a single UPS) via upssched
2023 May 19
3
Synthesize low batt (LB) fron SNMP UPS which does not support this?
My $0.02: LB is baked in to nut behavior. So if a UPS doesn't report LB, then it makes sense to synthesize it. Synthetic LB is the cleanest fix at the earlier processing point. One could have a config that is basically synthetic-lowbatt-percent that generates LB if (as Jim says) on battery, not calibrating, and batt% <= that. One could have a similar config
2023 May 17
1
Synthesize low batt (LB) fron SNMP UPS which does not support this?
Hi all, On 5/16/23 20:08, Carsten Aulbert wrote: > Idly browsing the client sources, I guess I could try to add our logic > here[1] and use [2] to gather the battery stats from our UPS and then > decide if this UPS is considered critical or not. But for this, I would > need to dust off/excavate my ancient poor C knowledge ;-). > > I guess I will give this a try unless
2023 May 17
2
Synthesize low batt (LB) fron SNMP UPS which does not support this?
Makes sense, and a PR is a way to solicit feedback :) I'd document this for ups.conf (man page and examples), including a note that for devices which do provide a healthy LB these values may be set to 0 safely. Wondering if non-zero defaults should be there anyway. @Community, WDYT? Also, this critical-state check should be done only when the UPS is on battery (and perhaps not calibrating),
2023 May 17
1
Synthesize low batt (LB) fron SNMP UPS which doesnot support this?
Hi Gene, On 5/16/23 21:08, gene heskett wrote: > Take an extra vitamin b1 and start hacking ;o) yeah ;-) > > Seriously, if its that important, do as I did when my last wife was > dying of COPD. :( sorry to hear > Leave your ups setup as is but for under $10k (USD), > have an automatic home sized standby generator installed to run the > important stuff, no room for
2023 May 22
1
Synthesize low batt (LB) fron SNMP UPS which does not support this?
Hi all, On 5/19/23 15:11, Greg Troxel wrote: > LB is baked in to nut behavior. So if a UPS doesn't report LB, then > it makes sense to synthesize it. Synthetic LB is the cleanest fix at > the earlier processing point. I fully agree and thus this ought to be done in/near uspd IMHO. I glanced over the server/ directory and was not sure where even to begin hooking this
2010 Aug 21
1
Fw: Interfacing a Contact-Closure UPS to Mac OS X and Linux
Hi David As per the link http://www.llondel.org/ups.shtml & the final testing paragraph. I have set up a Lantech UPS similiar to your write up for your Powersure Proactive and Powersure Personal UPS's On LOW BATT it shuts down OK. BUT as with other many UPS's during the wait period from low batt to start of shutdown ... IE [SHUTDOWNCMD "/sbin/shutdown -h +20"]
2002 Sep 17
2
PXElinux Modification Question
Hi, We are new to PXElinux and we are using it in our test lab to do provisioning. When the systems come up there is a PXElinux menu to boot local(default) or boot to the imaging environment (linux). It works great, but we have to visit each machine whenever we want to create or restore a disk image. Now we would like to be able to remotely force a system to re-image itself. The
2023 May 16
1
Synthesize low batt (LB) fron SNMP UPS which doesnot support this?
On 5/16/23 14:09, Carsten Aulbert wrote: > Hi Roger, > > On 5/16/23 17:00, Roger Price wrote: >> Hello Carsten, That's what I did but for a much simpler setup. I live >> in an area with a lot of lightning, and my shutdown criteria is to be >> able to shut down repeatedly during an electrical storm.? The NOTIFY >> and CMDSCRIPT and the upssched-cmd logic are
2023 May 24
1
Synthesize low batt (LB) fron SNMP UPS which does not support this?
Hmm, looking at status_commit(), if the UPS actually reported just ?OB", but the ?ignorelb? logic kicked in, wouldn?t status_commit() change it to ?OB LB?? And would clients interpret that correctly? And, assuming status_commit() is called, is the status so saved what?s returned on a future client query? I?m really unsure how all of this works. I don?t suppose there?s some kind of ?general
2003 Nov 01
3
authentication question: pptp tunnels for cisco vpn 3000
I have a Cisco VPN Concentrator 3000, It has the ability to auth PPTP tunnels off of a WinNT Domain controler. Well, I to use my samba3 box instead of a WinNT box. I have samba3 running off of an LDAP back end. Anyway, I setup the VPN Concentrator to auth off of the samba box, and when I test it with the test option, and it works, but when I try to auth a pptp tunnel, it fails saying the
2010 Feb 08
1
megatec and blazer drivers for (brand)Tuncmatik (series)Newtech Pro 1KVA
Hi, I would like to report that Tuncmatik Newtech Pro 1 KVA (http://www.tuncmatik.com/en-US/productDetail.asp?RecID=290) works with nut(2.4.1) blazer_usb, blazer_ser and megatec drivers. The UPS came with an usb cable and a java based software for both linux and windows, named ViewPower (http://www-power-software-download.com). This UPS has double interface a USB interface and a serial