Displaying 3 results from an estimated 3 matches for "227500mv".
battery not installed, but battery still 100% and NUT 2.7.2-4 does not catch this and report a error
2017 Apr 10
2
battery not installed, but battery still 100% and NUT 2.7.2-4 does not catch this and report a error
...ilto:jon.bendtsen at jonix.dk>>:
[cuuuuut]
> I'd say your change is a success :-)
well, almost, but maybe that is outside NUT's control.
/usr/lib/nagios/plugins/check_ups -H dkvideobackup -u apc1500
UPS OK - Status=Online, Unknown Utility=227.5V Batt=100.0% Load=0.0%
|voltage=227500mV;;;0 battery=100%;;;0;100 load=0%;;;0;100
JonB
battery not installed, but battery still 100% and NUT 2.7.2-4 does not catch this and report a error
2017 Apr 10
0
battery not installed, but battery still 100% and NUT 2.7.2-4 does not catch this and report a error
...[cuuuuut]
>
>
>> I'd say your change is a success :-)
>
> well, almost, but maybe that is outside NUT's control.
>
> /usr/lib/nagios/plugins/check_ups -H dkvideobackup -u apc1500
> UPS OK - Status=Online, Unknown Utility=227.5V Batt=100.0% Load=0.0%
> |voltage=227500mV;;;0 battery=100%;;;0;100 load=0%;;;0;100
Actually maybe it is within NUT's control. Maybe NUT should only claim that a
UPS is ONLINE if ONLINE is the only thing it is?
JonB
battery not installed, but battery still 100% and NUT 2.7.2-4 does not catch this and report a error
2017 Apr 04
4
battery not installed, but battery still 100% and NUT 2.7.2-4 does not catch this and report a error
2017-04-04 14:18 GMT+02:00 Jon Bendtsen <jon.bendtsen at jonix.dk>:
> On 04/04/17 14.10, Roger Price wrote:
>
>> On Tue, 4 Apr 2017, Arnaud Quette wrote:
>>
>>
> [cuuuuut]
>
> Hi Arnaud, It seems to me that, looking out into the future, there are
>> three
>> things upsmon needs:
>>
>> 1. A fall-through <notify type> of