Displaying 14 results from an estimated 14 matches for "0.2625".
Did you mean:
0.0625
2013 Feb 21
2
ggplot2, geomtile fill assignment
Dear R help,
I have some readings in three dimensions (x, y, z) and an amplitude for
each. I'd like to visualize the data using ggplot, using tile plots, as I
have some additional point data I would like to eventually overlay on the
tile plots.
I would like to subset the data by sections, slices if you will, in the z
dimension, and plot the data for that slice.
I can do all of this, but am
2011 Apr 28
1
Extract complete rows by group and maximum
Hi
I'm trying to extract complete rows from a dataframe by group based on
the maximum in a column within that group.
Thus I have a dataframe:
cvd_basestudy ... es_time ...
_____________
study1 ... 0.3091667
study2 ... 0.3091667
study2 ... 0.2625000
study3 ... 0.3033333
study3 ... 0.2625000
__________
etc
I can extract the basestudy and the max(es_time)
2009 Jul 21
2
Odd coefficent behavior
Why are my coefficients getting appended with a 1? It borks a match I
do later against the original list that doesn't have the random 1
added to the end.
> linearModel[[1]]
Call:
lm(formula = modelSource ~ +UNITBUILD + UNITDB + ITBUILD + ITDB +
UATBUILD + UATDB + HOGANCODE + RCF + ReleaseST1 + ReleaseST2 +
ReleaseBLA + Small.Bank.Acquisitions + HLY.NewYear + HLY.MLK +
HLY.PRES +
2009 Aug 04
0
Problems with lqs()
Dear List-Members,
I have a problem with the function lqs() from package MASS. In some cases it produces different results for the same settings and needs a random seed to be set, in other cases not.
I really cannot understand, why this happens. As well I do not understand what exactly you need the random seed for. Is it a starting point for iterations? Or do different results occur because of
2016 Dec 17
19
llvm (the middle-end) is getting slower, December edition
First of all, sorry for the long mail.
Inspired by the excellent analysis Rui did for lld, I decided to do
the same for llvm.
I'm personally very interested in build-time for LTO configuration,
with particular attention to the time spent in the optimizer.
Rafael did something similar back in March, so this can be considered
as an update. This tries to include a more accurate high-level
2016 Dec 18
1
llvm (the middle-end) is getting slower, December edition
On Sat, Dec 17, 2016 at 6:39 PM, Mehdi Amini <mehdi.amini at apple.com> wrote:
>
>> On Dec 17, 2016, at 1:35 PM, Davide Italiano via llvm-dev <llvm-dev at lists.llvm.org> wrote:
>>
>> First of all, sorry for the long mail.
>> Inspired by the excellent analysis Rui did for lld, I decided to do
>> the same for llvm.
>> I'm personally very
2006 May 10
1
ape comparative analysis query
I've been comparing variables among objects (taxa) related by known
trees, using phylogentically independent contrasts in the ape package,
and want to move on to more complex models e.g. by using gls with
appropriate correlation terms. My trees contain lots of (hard)
polytomies and information about ancestors, which I've been including-
creating fully dichotomous trees by using zero branch
2016 Dec 18
0
llvm (the middle-end) is getting slower, December edition
> On Dec 17, 2016, at 1:35 PM, Davide Italiano via llvm-dev <llvm-dev at lists.llvm.org> wrote:
>
> First of all, sorry for the long mail.
> Inspired by the excellent analysis Rui did for lld, I decided to do
> the same for llvm.
> I'm personally very interested in build-time for LTO configuration,
> with particular attention to the time spent in the optimizer.
>
2013 Mar 01
7
Conditional Weighted Average (ddply or any other function)
Hello R community,
I am computing weighted average statistic by using ddply function:
My data set is:
N1 T1 S1 I1 C1 FY-4 ROE11 EPS11 MKT11
N1 T1 S1 I1 C1 FY-3 ROE12 EPS12 MKT12
N1 T1 S1 I1 C1 FY-2 ROE13 EPS13 MKT13
N1 T1 S1 I1 C1 FY-1 ROE14 EPS14 MKT14
N1 T1 S1 I1 C1 FY0 ROE15 EPS15 MKT15
N1 T1 S1 I1 C1 FY1 ROE16 EPS16 MKT16
N1 T1 S1 I1 C1 FY2 ROE17
2004 May 25
5
Histogram
Dear all,
I have a surprising problem with the representation of frequencies in a
histogram.
Consider, for example, the R code:
b<-rnorm(2000,3.5,0.3)
hist(b,freq=F)
When I plotted the histogram, I expected that values in the y-axis (the
probability) varied between 0 and 1. Instead, they varied within the
range 0-1.3.
Have you got any suggestion for obtaining a correct graph with
2016 Dec 18
0
llvm (the middle-end) is getting slower, December edition
> On Dec 17, 2016, at 1:35 PM, Davide Italiano via llvm-dev <llvm-dev at lists.llvm.org> wrote:
>
> First of all, sorry for the long mail.
> Inspired by the excellent analysis Rui did for lld, I decided to do
> the same for llvm.
> I'm personally very interested in build-time for LTO configuration,
> with particular attention to the time spent in the optimizer.
>
2016 Dec 18
0
llvm (the middle-end) is getting slower, December edition
On 12/17/2016 01:35 PM, Davide Italiano via llvm-dev wrote:
> First of all, sorry for the long mail.
> Inspired by the excellent analysis Rui did for lld, I decided to do
> the same for llvm.
> I'm personally very interested in build-time for LTO configuration,
> with particular attention to the time spent in the optimizer.
> Rafael did something similar back in March, so
2016 Dec 18
0
llvm (the middle-end) is getting slower, December edition
On Sat, Dec 17, 2016 at 1:35 PM, Davide Italiano via llvm-dev <
llvm-dev at lists.llvm.org> wrote:
> First of all, sorry for the long mail.
> Inspired by the excellent analysis Rui did for lld, I decided to do
> the same for llvm.
> I'm personally very interested in build-time for LTO configuration,
> with particular attention to the time spent in the optimizer.
>
2016 Dec 20
0
llvm (the middle-end) is getting slower, December edition
Hi Davide,
Thanks for the analysis, it's really interesting! And I'm really glad that we now put more and more attention at the compile time!
Just recently I've been looking into historical compile time data as well, and have had similar conclusions. The regressions you've found are probably caused by:
1) r289813 and r289855 - new matchers in InstCombine
2) r286814 and r288024 -