Displaying 10 results from an estimated 10 matches for "0.0210".
Did you mean:
0.0200
2003 Oct 24
1
gee and geepack: different results?
Hi, I downloaded both gee and geepack, and I am trying to understand the
differences between the two libraries.
I used the same data and estimated the same model, with a correlation
structure autoregressive of order 1. Surprisingly for me, I found very
different results. Coefficients are slightly different in value but
sometimes opposite in sign.
Moreover, the estimate of rho (correlation
2011 Feb 03
2
tapply output as a dataframe
On Mon, Apr 13, 2009 at 12:41 PM, Dan Dube <ddube-at-advisen.com> wrote:
> i use tapply and by often, but i always end up banging my head against
> the wall with the output.
The proposed solution of Dan's problem posted on R-help was:
> do.call(rbind,a)
When I use this 'solution' I get 'ERROR: second argument must be a list'. So head on wall continues.
My
2006 Aug 18
2
4^2 factorial help
To whom it may concern:
I am trying a factorial design a system of mine that has two factors.
Each factor was set at four different levels, with one replication for
each of the combinations. My data is as follows:
A B Response
1 600 2.5 0.0257
2 600 2.5 0.0254
3 600 5
2008 Dec 22
3
Summary information by groups programming assitance
All -
I have data that looks like
psd Species Lake Length Weight St.weight Wr
Wr.1 vol
432 substock SMB Clear 150 41.00 0.01 95.12438
95.10118 0.0105
433 substock SMB Clear 152 39.00 0.01 86.72916
86.70692 0.0105
434 substock SMB Clear 152 40.00 3.11 88.95298
82.03689 3.2655
435 substock SMB Clear
2004 Oct 26
1
Newbie question about the use of lm and anova
Version of R: Windows Version 2.0.0
The experimental design contains two plant lines - a control (C) and a
mutant (M) - grown out three separate times in plots A, B, C.
The design is unbalanced:
In plot A, 9 control plants were grown with 29 mutant plants.
In plot B, 8 control plants were grown with 20 mutant plants.
In plot C, 8 control plants were grown with 22 mutant plants.
The
2005 Dec 12
2
convergence error (lme) which depends on the version of nlme (?)
Dear list members,
the following hlm was constructed:
hlm <- groupedData(laut ~ design | grpzugeh, data = imp.not.I)
the grouped data object is located at and can be downloaded:
www.anicca-vijja.de/lg/hlm_example.Rdata
The following works:
library(nlme)
summary( fitlme <- lme(hlm) )
with output:
...
AIC BIC logLik
425.3768 465.6087 -197.6884
Random effects:
2006 Feb 21
6
How to sum values across multiple variables using a wildcard?
I have a dataframe called "data" with 5 records (in rows) each of
which has been scored on each of many variables (in columns).
Five of the variables are named var1, var2, var3, var4, var5 using
headers. The other variables are named using other conventions.
I can create a new variable called var6 with the value 15 for each
record with this code:
> var6=var1+var2+var3+var4+var5
2008 Dec 29
0
Serial Correlation Test for Short Time Series
Hello,
Are there any R functions available for performing a serial correlation test
for short
time series (e.g, series having between 10-14 observations)?
Many thanks!
Isabella R. Ghement, Ph.D.
Ghement Statistical Consulting Company
301-7031 Blundell Road, Richmond, B.C., Canada, V6Y 1J5
Tel: 604-767-1250
Fax: 604-270-3922
E-mail: isabella at ghement.ca
Web: www.ghement.ca
-----Original
2008 Jan 28
0
[LLVMdev] 2.2 Prerelease available for testing
Target: FreeBSD 7.0-RC1 on amd64.
autoconf says:
configure:2122: checking build system type
configure:2140: result: x86_64-unknown-freebsd7.0
[...]
configure:2721: gcc -v >&5
Using built-in specs.
Target: amd64-undermydesk-freebsd
Configured with: FreeBSD/amd64 system compiler
Thread model: posix
gcc version 4.2.1 20070719 [FreeBSD]
[...]
objdir != srcdir, for both llvm and gcc.
Release
2008 Jan 24
6
[LLVMdev] 2.2 Prerelease available for testing
LLVMers,
The 2.2 prerelease is now available for testing:
http://llvm.org/prereleases/2.2/
If anyone can help test this release, I ask that you do the following:
1) Build llvm and llvm-gcc (or use a binary). You may build release
(default) or debug. You may pick llvm-gcc-4.0, llvm-gcc-4.2, or both.
2) Run 'make check'.
3) In llvm-test, run 'make TEST=nightly report'.
4) When