Derek Atkins
2015-Feb-02 14:14 UTC
ANNOUNCE: [MAINT] Planned Server Outage today, 8pm US/EST (0100UTC)
Hi All, I've ordered a new switch for my network (it should arrive today) and need to install and deploy it. Doing so will require that I rewire parts of the server rack affecting connectivity of all the machines therein, including the gnucash server (code). This outage will affect email, git, wiki, etc. Everything except for www.gnucash.org. Unless I accidentally hit the wrong wire the outage should be short -- the most time will be spent physically installing the switch in the rack. Hopefully you wont notice the outage at all ;) I'll send immediate updates to #gnucash on IRC before I start and after I complete, and send another email when the maintenance is complete. Please let me know if this timing is an issue. -derek -- Derek Atkins, SB '93 MIT EE, SM '95 MIT Media Laboratory Member, MIT Student Information Processing Board (SIPB) URL: http://web.mit.edu/warlord/ PP-ASEL-IA N1NWH warlord at MIT.EDU PGP key available