Dear Pawel, is it too difficult to forcibly stop rebuilding of a composite geom instance? It is often needed (or at least desirable), but all attemtpt fail: # graid3 status r0h Name Status Components raid3/r0h DEGRADED ad0h ad4h ad8h (20%) # graid3 stop r0h Cannot destroy device r0h (error=16). Even # graid3 unload Could not unload module: Device busy. I can remove provider which are in rebuild state: # graid3 remove -n2 r0h GEOM_RAID3: Device r0h: provider ad8h disconnected. GEOM_RAID3: Device r0h: rebuilding provider ad8h stopped. But this destroys rebuild state completely even when r3 device is read-only. The same state for gmirror. Any hints? Thanks in advance. Sincerely, D.Marck [DM5020, MCK-RIPE, DM3-RIPN] ------------------------------------------------------------------------ *** Dmitry Morozovsky --- D.Marck --- Wild Woozle --- marck@rinet.ru *** ------------------------------------------------------------------------