Displaying 20 results from an estimated 10000 matches similar to: "[LLVMdev] LLVM 3.1 Release schedule delay?"
2012 Mar 29
0
[LLVMdev] Announcing 3.1 Release Branch Date!
> By the way, we are looking for ARM testers. There was a lot of interest in the 3.0 release for an ARM release. We will try to do one this release on a trial basis. We are looking for ARMv7 cortex-a8 and cortex-a9 on Linux.
  We have two pandard board (ARMv7 cortex-a9) and perhaps one ARMv6
4-cores board. Do we do a native compile or cross compile for the ARM
platform?
Regards,
chenwj
-- 
2012 Apr 14
0
[LLVMdev] About LLVM 3.1 ARM testing
On Sat, Apr 14, 2012 at 4:13 AM, 陳韋任 <chenwj at iis.sinica.edu.tw> wrote:
> Hi all,
>
>  Since the 3.1 testing day is coming and be a ARM tester, I would like to
> make
> sure everything is O.K. so that we don't waste the precious time. As
> discussed
> on the ML before, I plan to cross compile LLVM/Clang first, then run
> regression
> test and test suite on
2012 Apr 15
3
[LLVMdev] About LLVM 3.1 ARM testing
> Ubuntu on ARM is softfp, right?  How about testing hardfp with a
> distribution like ArchLinuxArm?
  Yes, Ubuntu on ARM is softfp. But I already told Bill the platform I prepare
to test and the testing day begins *tomorrow*, I prefer what it likes now. BTW,
what if I use a cross compiler with hardfp enabled to compile LLVM first, then
run it on Ubuntu/ARM? Does it achieve your goal, too?
2012 May 08
2
[LLVMdev] 3.1 Release Notes
On Tue, May 08, 2012 at 10:02:58AM +0200, Albert Graef wrote:
> On 05/08/2012 08:05 AM, Bill Wendling wrote:
> > The 3.1 release is scheduled for next Monday. Please check the ReleaseNotes.html file to make sure that it's up-to-date.
> 
> Are there any tarballs for the current release candidate available 
> somewhere, so that I can test my stuff against the new release?
 
2012 May 08
2
[LLVMdev] RE : svn trunk comilation error
Hi,
Sorry I did not precise that, but I'm already doing that...
I have, as you say, two different director, one for source and one for build (where I run my configure)...
Cheers
________________________________________
De : 陳韋任 [chenwj at iis.sinica.edu.tw]
Date d'envoi : mardi 8 mai 2012 05:21
À : Rinaldini Julien
Cc: LLVM Developers Mailing List
Objet : Re: [LLVMdev] svn trunk
2012 Apr 21
2
[LLVMdev] Trouble with tweaking test-release.sh script
Hi Bill,
  The preliminary result of regression test on ARM shows quit a lot failures,
which makes me nervous. After discussion on IRC, echristo and chandlerc sugguested
the following possibilities,
  1) some flag weirdness
  2) miscompile via cross toolchain
  3) architecture-specific fundamental bug
chandlerc told me compile LLVM/Clang without "-fno-strict-aliasing" first, see
if
2012 Apr 14
2
[LLVMdev] About LLVM 3.1 ARM testing
Hi all, 
  Since the 3.1 testing day is coming and be a ARM tester, I would like to make
sure everything is O.K. so that we don't waste the precious time. As discussed
on the ML before, I plan to cross compile LLVM/Clang first, then run regression
test and test suite on the pandaboards. Could someone help me check to see if I
miss something? Thanks!
  Here is the pandaboard configuration,
2012 Sep 13
3
[LLVMdev] Fail to compile LLVM on Gentoo Linux
On Sep 12, 2012, at 8:50 PM, Sean Silva <silvas at purdue.edu> wrote:
>> /nfs_home/chenwj/llvm-3.1/svn/llvm/tools/clang/lib/Frontend/InitHeaderSearch.cpp:197:1: internal compiler error: in extract_insn, at recog.c:2103
> 
> I think that this is a GCC ICE.
Yes, very definitely. 
Jim
> 
> --Sean Silva
> 
> On Wed, Sep 12, 2012 at 10:53 PM, 陳韋任 (Wei-Ren Chen)
>
2012 Aug 28
1
[LLVMdev] How to write a regression test case?
thank yang,thank Wei-Ren!
i feel i am a question boy,because i has another question now.
i want to check if a program output right result,which example in
llvm/test/* can give me some idea?
suppose i have a helloworld program if it run well,it can give me a
result "helloworld",so i want to check if the result is "helloworld".
best wishes!
changcheng
On Tue, Aug 28, 2012
2013 Jan 11
0
[LLVMdev] Update PTX section in CodeGenerator.html
Hi Justin,
Is there any progress on new CUDA by llvm PTX?
Cheers,
Dan
On 11 January 2013 07:57, 陳韋任 (Wei-Ren Chen) <chenwj at iis.sinica.edu.tw>wrote:
> Hi Justin,
>
>   I believe the PTX section in the link below need some love,
> updating "lib/Target/PTX" to "lib/Target/NVPTX" for example.
> Would you like to take a look?
>
>  
2013 Jan 11
0
[LLVMdev] Obsolete PTX is NOT completely removed in 3.2 release
Removed from trunk.  Pawel can decide if its necessary to update the
tarballs.
Thanks for the report!  Apparently git-svn does not delete removed
directories.
On Fri, Jan 11, 2013 at 1:36 AM, 陳韋任 (Wei-Ren Chen) <
chenwj at iis.sinica.edu.tw> wrote:
> Hi Pawel,
>
>   PTX already be replaced with NVPTX. However, PTX subdirectory
> still sit in lib/Target in 3.2 release. Do you
2013 Jan 11
0
[LLVMdev] Update PTX section in CodeGenerator.html
Right, I forgot to update that originally.  I also have a separate document
in the works that goes into more detail for NVPTX.
On Fri, Jan 11, 2013 at 2:57 AM, 陳韋任 (Wei-Ren Chen) <
chenwj at iis.sinica.edu.tw> wrote:
> Hi Justin,
>
>   I believe the PTX section in the link below need some love,
> updating "lib/Target/PTX" to "lib/Target/NVPTX" for example.
2013 Feb 06
0
[LLVMdev] How to write up XXInstFormat.td?
I suggest u grep how this file is used.
Since it is included in xxInstrInfo.td and this is its only use, we can
conclude that this file does nothng more than defining some helper tablegen
classes and we thus can totally move these definitions into xxInstrInfo.td
and then remove XXInstFormat.td
Regards.
在 2013-2-6 下午4:52,"陳韋任 (Wei-Ren Chen)" <chenwj at iis.sinica.edu.tw>写道:
>
2012 Dec 22
2
[LLVMdev] "Write An LLVM Backend Tutorial For Cpu0"
>   Do you think it's O.K. to put the link somewhere else on the web site?
I have been considering adding a page of assorted links to external
documentation. I'm not sure if anybody else wants such a page though.
-- Sean Silva
On Fri, Dec 21, 2012 at 12:25 AM, 陳韋任 (Wei-Ren Chen)
<chenwj at iis.sinica.edu.tw> wrote:
> Hi Chris,
>
> On Thu, Dec 20, 2012 at 10:24:39PM
2013 Jan 11
1
[LLVMdev] Obsolete PTX is NOT completely removed in 3.2 release
On 1/11/2013 7:15 AM, Justin Holewinski wrote:
> Removed from trunk.  Pawel can decide if its necessary to update the
> tarballs.
> 
> Thanks for the report!  Apparently git-svn does not delete removed
> directories.
PTX directories still exists in release_32 branch and RELEASE_32/final.
But they are all empty so PTX can not be build.
> 
> 
> On Fri, Jan 11, 2013 at 1:36
2013 Apr 09
3
[LLVMdev] [cfe-dev] [Announcement] 3.3 Release Planning!
On Tue, Apr 9, 2013 at 1:43 AM, 陳韋任 (Wei-Ren Chen) <chenwj at iis.sinica.edu.tw
> wrote:
> > > If we do end up creating ARM binaries for the general public, your
> input
> > > and expertise will be greatly appreciated! ;)
> > I will be happy to provide some Debian & Ubuntu ARM packages. I just
> > need access to ARM server(s).
>
>   I don't
2012 May 01
2
[LLVMdev] Running LLVM JIT on qemu-system-arm
Could you tell me the current status of MIPS JIT?
On Mon, Apr 30, 2012 at 11:38 PM, 陳韋任 <chenwj at iis.sinica.edu.tw> wrote:
> > Thanks for your information.
> > Could you suggest any other framework that I could use for making a
> custom JIT
> > for ARM?
> > I am doing research on JIT compilation for a heterogeneous processor
> system.
>
>   If not for
2012 May 09
0
[LLVMdev] RE : RE : RE : svn trunk comilation error
> De : 陳韋任 [chenwj at iis.sinica.edu.tw]
> Date d'envoi : mardi 8 mai 2012 11:37
> À : Rinaldini Julien
> Cc: LLVM Developers Mailing List
> Objet : Re: [LLVMdev] RE :  svn trunk comilation error
>
> Hi Rinaldini,
>
> You probably need to illustrate what your enviroment is, what revision you
> checkout and how you build LLVM. I have no problem build LLVM svn here.
2012 Apr 16
2
[LLVMdev] How to compile this linux-driver like programme into .bc file?
Thank you, Chen!
 
The thing is that I know the Makefile to complete that task. But what  I want to know the clang command that can do that. Since the makefile will generate a .ko file while I can use the clang command "-O3-emit-llvm" to generate a corresponding .bc file so the pass can be run on that.
 
Any help? 
--
            祝好!
 
  甄凯
2012 May 08
2
[LLVMdev] RE : RE : svn trunk comilation error
> De : 陳韋任 [chenwj at iis.sinica.edu.tw]
> Date d'envoi : mardi 8 mai 2012 11:37
> À : Rinaldini Julien
> Cc: LLVM Developers Mailing List
> Objet : Re: [LLVMdev] RE :  svn trunk comilation error
>
> Hi Rinaldini,
>
> You probably need to illustrate what your enviroment is, what revision you
> checkout and how you build LLVM. I have no problem build LLVM svn here.