Displaying 20 results from an estimated 200 matches similar to: "Fitting Beta Distribution"
2017 Dec 21
1
Fitting Beta Distribution
Dear All,
I need to fit a custom probability density (based on the symmetric beta
distribution B(shape, shape), where the two parameters shape1 and shape2
are identical) to my data.
The trouble is that I experience some problems also when dealing with the
plain vanilla symmetric beta distribution.
Please consider the code at the end of the email.
In the code, dbeta1 is the density of the beta
2012 May 13
2
Discrete choice model maximum likelihood estimation
Hello,
I am new to R and I am trying to estimate a discrete model with three
choices. I am stuck at a point and cannot find a solution.
I have probability functions for occurrence of these choices, and then I
build the likelihood functions associated to these choices and finally I
build the general log-likelihood function.
There are four parameters in the model, three of them are associated to
2012 May 13
1
how to write data using xlsReadWrite
Hai I'm Dee. I'm trying to write var data from these codes inside excel
file. My directory to store the data is *D:\FYP\image* .
these are my codes, can you help give an advice or idea with my problem:
l*ibrary("biOps")
library("waveslim")
library("xlsReadWrite")
x <- readTiff("D:\\FYP\\image\\SignatureImage\\user186g1.tif")
y <-
2012 May 13
4
write data using xlsReadWrite
Hai, I'm trying to write these var output data from these codes inside excel
file. My directory to store the data is
/D:\FYP\image /
but receive an error message :
/Error in write.xls(mydata, "D:\\FYP\\image.mydata.xls") :
object 'mydata' not found/
these are my codes, can you help give an advice or idea with my problem:
/library("biOps")
2003 Mar 17
2
scoping rules; summary
Hi everyone
thanks for the replies.
The issue was NOT a font problem; I deliberately chose ll1 and l11 as
examples of easily confused variable names (evidently these were too
easily confused ;-). The code snippet was written as intended, and
increment() contained a deliberate, highlighted, bug. I was asking
for guidance on avoiding/finding this sort of coding error.
That was why I wrote
2003 Mar 17
1
scoping rules
Hi
I recently found a bug that was isomorphic to the following:
ll1 <- 2
increment <- function(x)
{
l11 <- 1
return(x+ll1) #bug here
}
Of course, R is obeying the scoping rules just fine, but I'm evidently
not setting the do.what.I.mean.not.what.I.say variable correctly.
Now, how do I avoid making this type of error? ... and what is the
best tool for tracking it down?
--
2006 Mar 27
1
Missing Argument in optim()
Hello everybody,
i already searched the archieves, but i still don't know what is wrong
in my implementation, mybe anybody coud give me some advice
ll1<-function(rho,theta,beta1,beta2,beta3,beta4,t,Szenariosw5,Testfaellew5,X1,X2)
{
n<-length(t)
t<-cumsum(t)
tn<-t[length(t)]
Szenn<-Szenariosw5[length(Szenariosw5)]
2006 Jan 25
0
Log-Likelihood 3d-plot and contourplot / optim() starting values
Hello,
i have coded the following loglikelihood-function
# Log-Likelihood-Funktion
loglik_jm<-function(N,phi,t) {
n<-length(t)
i<-seq(along=t)
s1<-sum(log(N-(i-1)))
s2<-phi*sum((N-(i-1))*t[i])
n*log(phi)+s1-s2
}
# the data
t<-c(7,11,8,10,15,22,20,25,28,35)
# now i want to do a 3d-plot and a contourplot in order to see at which
values of N and phi the loglikelihood
2012 Oct 29
0
why isn't integrate function working in a likelihood
Dear R users,
I have been trying to solve for mle's of a function that involves an
integral and I keep getting an error. I created an example to work on first
and even the simple example doesn't give me the mle's. I am getting the
error "Error in integrate(integrand, 0, Inf) : non-finite function value".
I divided my likelihood function into two parts, one part involves
2006 Jan 14
1
Different length of objects
Hello,
i got an warning message in the following code:
f<-1:100
t<-1:100
b<-100
ll2 <- function(b,f,t) {
t<-cumsum(t)
tn<-t[length(t)]
i<-seq(along=f)
s1<-(tn*exp(-b*tn)*sum(f[i]))/(1-exp(-b*tn))
s2<-sum((f[i]*(t[i]*exp(-b*t[i])-t[i-1]*exp(b*t[i-1])))/(exp(-b*t[i-1])-exp(-b*t[i])))
s1-s2
}
ll2(b,f,t)
i think, the problem here is, that t[0] doesn't
2007 Nov 13
1
TRUNCATED error with data frame
Hi ,
I am new to R.
I am trying to run a simple R script as shown below:
aov.R
------
data1<-c(49,47,46,47,48,47,41,46,43,47,46,45,48,46,47,45,49,44,44,45,42,45,45,40
,49,46,47,45,49,45,41,43,44,46,45,40,45,43,44,45,48,46,40,45,40,45,47,40)
matrix(data1, ncol= 4, dimnames = list(paste("subj", 1:12),
c("Shape1.Color1",
"Shape2.Color1", "Shape1.Color2",
2011 Jul 29
1
How to interpret Kolmogorov-Smirnov stats
Hi,
Interpretation problem ! so what i did is by using the:
>fit1 <- fitdist(vectNorm,"beta")
Warning messages:
1: In dbeta(x, shape1, shape2, log) : NaNs produced
2: In dbeta(x, shape1, shape2, log) : NaNs produced
3: In dbeta(x, shape1, shape2, log) : NaNs produced
4: In dbeta(x, shape1, shape2, log) : NaNs produced
5: In dbeta(x, shape1, shape2, log) : NaNs produced
6: In
2020 Mar 26
0
unstable corner of parameter space for qbeta?
>>>>> Ben Bolker
>>>>> on Wed, 25 Mar 2020 21:09:16 -0400 writes:
> I've discovered an infelicity (I guess) in qbeta(): it's not a bug,
> since there's a clear warning about lack of convergence of the numerical
> algorithm ("full precision may not have been achieved"). I can work
> around this, but I'm
2012 Mar 15
2
Integrate inside function
Dear R users,
first I take this opportunity to greet all the R community for your
continuous efforts.
I wrote a function to calculate the pdf and cdf of a custom distribution
(mixed gamma model).
The function is the following:
pmixedgamma3 <- function(y, shape1, rate1, shape2, rate2, prev)
{
density.function<-function(x)
{
shape1=shape1
rate1=rate1
shape2=shape2
2011 Aug 01
3
Beta fit returns NaNs
Hi,
sorry for repeating the question but this is kind of important to me and i
don't know whom should i ask.
So as noted before when I do a parameter fit to the beta distr i get:
fitdist(vectNorm,"beta");
Fitting of the distribution ' beta ' by maximum likelihood
Parameters:
estimate Std. Error
shape1 2.148779 0.1458042
shape2 810.067515 61.8608126
Warning
2020 Oct 24
0
Fitting Mixed Distributions in the fitdistrplus package
Dear Charles,
Please, when you have questions about fitdistrplus, contact directly the authors of the package and not R-help.
When fitting non ? standard ? distributions with fitdistrplus, you should define by yourself the density and the cumulative distribution functions, or load a package which define them.
See FAQ for a general example :
2018 Jul 12
2
Problemas con la funcion "apply"
Buenos dias!
Os escribo para ver si me podeis ayudar con un asunto en el que me he quedado un poco encallado.
Lo que tengo que hacer es sacar los percentiles (0.001, 0.005, 0.95 y 0.999) de varias distribuciones beta, concretamente 418. Cada distribucion esta definida por los parametros "shape1" y "shape2". Por lo tanto tengo una base de datos de 418 filas y en cada una de
2009 Jul 01
1
Plot cumulative probability of beta-prime distribution
Hallo,
I need your help.
I fitted my distribution of data with beta-prime, I need now to plot the
Cumulative distribution. For other distribution like Gamma is easy:
x <- seq (0, 100, 0.5)
plot(x,pgamma(x, shape, scale), type= "l", col="red")
but what about beta-prime? In R it exists only pbeta which is intended only
for the beta distribution (not beta-prime)
This is
2020 Mar 26
2
unstable corner of parameter space for qbeta?
Given that a number of us are housebound, it might be a good time to try to
improve the approximation. It's not an area where I have much expertise, but in
looking at the qbeta.c code I see a lot of root-finding, where I do have some
background. However, I'm very reluctant to work alone on this, and will ask
interested others to email off-list. If there are others, I'll report back.
2006 Jul 04
1
problem getting R 2.3.1 svn r38481 to pass make check-all
Hi,
I noticed this problem on my home desktop running FC4 and again on my
laptop running FC5. Both have previously compiled and passed make
check-all on 2.3.1 svn revisions from 10 days ago or so. On both these
machines, make check-all is consistently failing (4 out of 4 attempts on
the FC 4 desktop and 3 out of 3 on the FC 5 laptop) in the
p-r-random-tests tests. This is with both default