similar to: summary for weekdays()

Displaying 20 results from an estimated 10000 matches similar to: "summary for weekdays()"

2009 Nov 03
1
How to display full name for the coefficients/factors in summary()?
Hi, I am wondering if there is a way to display the full anme of the regression coeffients/factors in the summary? Suppose I have a bogus data set using weekday as factor which has 7 levels such as: mydata <- sample(364) wk <- rep(1:7, 52) weekday <-
2017 Jun 05
2
months not working with local language (weekdays does)
For what it's worth, I tried setting my Region | Formats setting to Spanish (Peru) in Windows 10 Control Panel, and got Spanish weekday and month results. I believe on Windows we use the Microsoft C strftime function to produce these strings, with the %A (for weekday) or %B (for month) formats. So this question probably needs to be addressed to Microsoft. Duncan Murdoch On 05/06/2017
2017 Jun 05
0
months not working with local language (weekdays does)
Thank you Duncan and Rui for your time and interest in this issue. Maybe it is a problem with Windows 7 and Spanish, and not Windows 10. Let's wait for someone with the same enviroment, before assuming it's a problem with my PC/configuration. 2017-06-05 14:37 GMT-05:00 Duncan Murdoch <murdoch.duncan at gmail.com>: > For what it's worth, I tried setting my Region
2007 Dec 13
1
counting weekday in a month in R
Hi, I am trying to count weekday of the month using R. For example, 1/4/2001 is the 4th weekday of Jan, and 1/5/2001 is the 5th weekday of the month, and 1/8/2001 is the 6th weekday of the month, etc. I get as far as extracting the weekdays from a sequence of dates (see below). But I have not yet figured out a fast way of counting without using a For Loop. Does anyone know how to do such counting
2011 Jul 22
1
Summing values by weekday and weekend - based on daily dates
Hi, all Here I created a data frame like mydates<- seq(as.Date("2010-05-29"), length = 43, by = "day") myvalues<-runif(43,0,1) myframe<-data.frame(dates=mydates, day=weekdays(dates), value=myvalues) dates day value 1 2010-05-29 Saturday 0.14576143 2 2010-05-30 Sunday 0.37669604 3 2010-05-31 Monday 0.74813943 4 2010-06-01 Tuesday
2011 Jul 22
1
Summing daily values by weekday and weekend
(Sorry for reposting. Please delete previous msgs. Thanks!) Hi, all Here I created a data frame like mydates<- seq(as.Date("2010-05-29"), length = 43, by = "day") myvalues<-runif(43,0,1) myframe<-data.frame(dates=mydates, day=weekdays(dates), value=myvalues) dates day value 1 2010-05-29 Saturday 0.14576143 2 2010-05-30 Sunday 0.37669604
2008 Sep 11
5
How to obtain a sequence of dates consisting of only weekdays
Dear R-users, How do I obtain a sequence of dates consisting of only weekdays without the weekends in R? In S, I can do the following: timeSeq(from="12/17/2007", to="8/25/2008", by="weekdays") I tried using looking at timeSequence (fSeries package) and seq.Date (base package) but I do not know if I can specify "weekdays" rather than "day".
2017 Jun 05
0
months not working with local language (weekdays does)
Hello, This doesn't answer the question, but in portuguese it works as expected. > x <- as.Date("2017-06-05") > months(x) [1] "junho" > weekdays(x) [1] "segunda-feira" > sessionInfo() R version 3.4.0 (2017-04-21) Platform: x86_64-w64-mingw32/x64 (64-bit) Running under: Windows 7 x64 (build 7601) Service Pack 1 Matrix products: default
2009 Nov 02
2
how to print the full name of the factors in summary?
Hi, I am wondering if there is a simple way to fix the problem I am having. For unknown reason, I could not get the full name of the factors to be printed in the summary. I have tried to used summary.lm as well but the problem still persists. SJ$Weekday <-
2017 Jun 05
2
months not working with local language (weekdays does)
Hi, I want to reporte some strange behaviour with the "months" function, from base R. When using "months" to extract months from a date column, I'm getting the months in english, when I was expecting months in spanish. When using "weekdays" to extract days of week from a date column, I'm getting the the days in spanish (as expected). My understanding is
2010 Mar 12
6
Randomly sampling subsets of dataframe variable
Fellow R users, I am stumped on what would seem to be something fairly simple. I have a dataframe that has a variable named 'WEEK' that takes the numbers 1:26 (26 week time-period) with each number repeated five times consecutively (once for each weekday, Monday through Friday). Ex. 111112222233333.....2626262626. I would like to randomly extract two weekdays per five day week for
2010 Jul 15
2
How to plot a histogram of weekday frequencies in a list of dates?
Question from an [R] novice... Hi, I have a vector of date/times like the one shown below (a truncated sample of a much longer list...) > dates[1:4] [1] "2006-03-16 08:41:00" "2006-03-16 10:28:00" "2006-03-16 11:03:00" [4] "2006-03-16 11:04:00" I would like to generate a weekday histogram showing the frequency of dates falling on each weekday. I know
2006 Jun 23
3
Problems with weekday extraction from zoo objects
Hi Folks! I'm struggling with dates - but enough about my personal life..... I have two daily time series files. In one (x) the date format is Y/m/d and the other (y) is d/m/y. I used read.zoo on both and they read into R with no problem. Then I use: weekdays(as.Date(x$DATE)) and get what I expect - all the days of the week in my data set. When I use:
2010 May 17
6
Change order of columns in table?
I'm an R noob and have a (maybe) stupid question... I have a table where I have the weekdays and a number for each weekday of entries: Thats what the table looks like... Now I want to have an pie3D plot of this, but obviously the order of the weekdays are not as one would expect... Friday Monday Saturday Sunday Thursday Tuesday Wednesday 119 173 80
2002 Feb 22
1
Weekdays
Hello, I'm trying to write a function that returns the number of weekdays between a vector of start dates and a vector of end dates. Subtracting the 2 times the number of whole weeks is the easy part and works if the number of days is a multiple of 7. However, the number of weekend days in the tail is a little harder. It depends on both the start date of the tail and the number of days in
2011 Mar 09
2
Complex sampling?
R users, I am trying to generate a randomized weekday survey schedule that ensures even coverage of weekdays in the sample, where the distribution of variable DOW is random with respect to WEEK. To accomplish this I need to randomly sample without replacement two weekdays per week for each of 27 weeks (only 5 are shown). However, I need to sample from a sequence (3:7) that needs to be
2005 Dec 22
1
panel order in xyplot
Hi all, I have a question concerning xyplot. My data is a data.frame looking like that: In the first column I have numbers from 0 to 23 (hours of a day), the second column contains the name of a weekday (Day as factor) and the third column contains the number I am interested in. So as an example, the first five rows look like that: Hour Day Freq 1 0 Mo 23 2 1 Mo
2009 Dec 06
1
R ANOVA question
Hi All, I'm fitting an intercept ANOVA model using R. I'm using following contrast statement, so my first level is considered as base level. options(contrasts = c("contr.treatment", "contr.treatment")) My data has two factors are "Month" and "WeekDay". Due to default alphabetic ordering, the Month(April) and WeekDay(Friday) are considered as base
2001 Sep 07
1
chron is.weekend() function
Hello, I have a dataset which has fields giving both calendar date and weekday. I know better functions are now available, but I am still using chron because of the is.holiday() function and a homemade (even Heath Robinson would be ashamed) is.daylight() function. As a check for typos in the data input, I checked that the dates matched the weekdays. I'm getting some confusing results
2010 Jan 22
1
GoToIfTime issue
hi , all what's wrong with this command? exten => 222,1,GoToIfTime(11:00-14:00|mon,wed|*|*?1:3,1) as i got the error: -- Executing [222 at 95040:1] GotoIfTime("SIP/1001-00000099", "11:00-14:00|mon|wed|*|*?1:3|1") in new stack [Jan 20 11:21:11] WARNING[16804]: pbx.c:4118 get_range: Invalid day 'wed', assuming none but what should i do. if i want to set