similar to: wday not honored in cron trigger

Displaying 20 results from an estimated 600 matches similar to: "wday not honored in cron trigger"

2013 Oct 04
2
Possible POSIXlt / wday glitch & bugs.r-project.org status
Wanted to raise two questions: 1. Is bugs.r-project.org down? I haven't been able to reach it for two or three days: ``` ping bugs.r-project.org PING rbugs.research.att.com (207.140.168.137): 56 data bytes Request timeout for icmp_seq 0 Request timeout for icmp_seq 1 Request timeout for icmp_seq 2 Request timeout for icmp_seq 3 Request timeout for icmp_seq 4 Request timeout for icmp_seq 5
2013 Apr 22
2
subset dataframe
I can't understand what is happening. This is the code and results: > agoa <- read.table(file = "C:/Users/HTPC/Documents/_Documents/Research/WithDidia/AGOAUSImports.txt", header = T, sep = "\t", dec = ".", na.strings = "NA", stringsAsFactors = T)# > str(agoa); names(agoa) 'data.frame':109 obs. of  19 variables:  $ X    : Factor w/ 39
2009 Jun 12
2
Sweave recode(car) and Lyx, compiling but not executing on Mac
I am just beginning to use Sweave with Lyx on a Mac (R2.8.1). I have 12 chunks of Sweave code that work fine, but this piece: <<>>= library(car)
2008 Dec 11
3
getting ISO week
Hi all, Is there a simple function already implemented for getting the ISO weeks of a Date object? I couldn't find one, and so wrote my own function to do it, but would appreciate a pointer to the "default" way. If a function is not yet implemented, could the code below be of interest to submit to CRAN? Best Regards, Gustaf --------------------
2024 May 09
2
Strange variable names in factor regression
On converting character variables to ordered factors, regression result has strange names. Is it possible to obtain same variable names with and without intercept? Thanks, Naresh mydf <- data.frame(date = seq.Date(as.Date("2024-01-01"), as.Date("2024-03-31"), by = 1)) mydf[, "wday"] <- weekdays(mydf$date, abbreviate = TRUE) mydf.work <- subset(mydf, !(wday
2010 Mar 25
4
Creating dataframe of all possible variable combinations
Hello, I need to create a dataframe containing all possible combinations of three variables: SITE (101,102,103,104), WDAY (MON,TUE,WED,THR,FRI), and TOD (MORN, AFTN). There should be a total of 40 unique combinations in my dataframe. I used expand.grid() successfully(?) to create my dataframe, but then when I went to order it by SITE, the resultant dataframe only contained four rows, one for each
2007 Oct 15
3
for loop if else conditional
date <- as.POSIXlt(Sys.time()) #present date for (i in 1:difftime(as.POSIXlt(Sys.Date()),"2007-10-01")) if (date$wday != 0 & date$wday != 6) {print(date);assign("date", (date-86400))} else (assign("date", (date-86400))) I am trying to print dates from present day to a day in the past, but omitting weekends. I am not doing something right, but can't
2010 Oct 01
3
Converting a dataframe column from string to datetime
Hi, I have a dataframe column of the form v<-c("Fri Feb 05 20:00:01.43000 2010","Fri Feb 05 20:00:02.274000 2010","Fri Feb 05 20:00:02.274000 2010","Fri Feb 05 20:00:06.34000 2010") I need to convert this to datetime form. I did the following.. lapply(v,function(x){strptime(x, "%a %b %d %H:%M:%OS %Y")}) This gives me a list that looks like
2011 May 14
2
changing the day of the week in dates format
Dear all, I have a question related to the POSIXlt function in R. I have a set of dates and times, for exmaple: startx <- as.POSIXct("2011-01-01 00:00:00") finx <- as.POSIXct("2011-12-31 00:00:00") daysx<- seq(startx, finx, by="24 hours") I want to change the dates of all the days falling on a Saturday to the next working day (i.e. Monday). So I
2007 Jan 17
2
problem with unlist POSIX date at midnight
Dear R-users, I use unlist of POSIX dates to extract the year, hour etc. With that I can search for files in my database which are in the form 'yyyymmddhh_synops.txt' However, I get stucked during midnight where unlist just gives NA's. The script is given below, the problem accurs at acc.period[16] (midnight). However when I write out the character, unlist works well. But
2007 Oct 16
1
try / tryCatch for download.file( ) within a for loop when URL does not exist
I am trying to download a bunch of files from a server, for which I am using download.file( ) within a for loop. The script is working fine except until download.file hits a URL which has no file, at which point it exits. I want to change this behavior to simple log the failure and maintain state within the for loop and iterate to next. I read about try / tryCatch but am having trouble
2008 Nov 11
1
Every other week recurring event
I have the code for computing a weekly event: (start_date..end_date).select{|d| d.wday == wday} but I am wondering if anyone has any ideas for using this to figure out a recurring event for every other week. Is it possible to somehow specify every other within the .select method? Any other implementation ideas? --~--~---------~--~----~------------~-------~--~----~ You received this message
2003 Aug 13
1
Problems with addition in big POSIX dates
Have you noticed any problems with big dates (>=1/1/2040) in R? Here is the bit of code that I'm having trouble with: > test.date <- strptime("1/1/2040",format="%m/%d/%Y") > > unlist(test.date) sec min hour mday mon year wday yday isdst 0 0 0 1 0 140 0 0 0 > > date.plus.one <- as.POSIXct(test.date) +
2002 Feb 11
2
Time Series ts() Objects
Hi, Is it possible to create a ts() object, whose data is daily based BUT measured only on working days? In other words, suppose I have a data set with 255 observations, measured from 29 June 1959 to 30 June 1960. How would I create such a data? I tried something like: ts(c(...), start(1959, 180)) but I'm not sure what to use for frequency. In other words I don't know how to
2008 Nov 21
5
Getting the number of years between two dates
Hey, I need to get the number of years (as a number) between two dates. Here is what I have as a helper. # Returns the number of years between now and the specified date. def years_ago(date) dateDifference = DateTime.now - date results =Date.day_fraction_to_time(dateDifference) return results[0] / 24 / 365; end I''m sure there is a better way to do this. What is it?
2006 Apr 10
3
timeAlign
I use POSIXct for datetimes. Is thee a timeAlign function that I can use where : align by year direction -1 ==> start of this year direction 1 ==> start of next year align by week direction -1 ==> date on last sunday direction 1 ==> date on next sunday align by day direction -1 ==> time at past midnight direction 1 ==> time at this comming
2007 Dec 11
3
Wrong length of POSIXt vectors (PR#10507)
Full_Name: Petr Simecek Version: 2.5.1, 2.6.1 OS: Windows XP Submission from: (NULL) (195.113.231.2) Several times I have experienced that a length of a POSIXt vector has not been computed right. Example: tv<-structure(list(sec = c(50, 0, 55, 12, 2, 0, 37, NA, 17, 3, 31 ), min = c(1L, 10L, 11L, 15L, 16L, 18L, 18L, NA, 20L, 22L, 22L ), hour = c(12L, 12L, 12L, 12L, 12L, 12L, 12L, NA, 12L,
2005 Oct 06
2
isdst
Can someone, please, explain the difference is results below (notice the isdst value) > unlist(as.POSIXlt('2005-7-1')) sec min hour mday mon year wday yday isdst 0 0 0 1 6 105 5 181 1 > unlist(as.POSIXlt(as.Date('2005-7-1'))) sec min hour mday mon year wday yday isdst 0 0 0 1 6 105 5 181 0
2007 Oct 15
1
String concatenation, File Path Handling to pass to download.file( ) [backslash in DOS paths]
Gabor, Thanks much. Your solution is elegant. My overall scheme is to take present date, and check whether it is a weekend, if not, then create a string based on the date, to concatenate into a url link for download.file( ). The files I need to download have a part which is in the format: mmddyy. I am working to make myself a system to connect to exchanges, and download end of day files from
2012 Apr 22
2
difficulty in Formatting time series data
Dear R-Gurus I have a data frame (from CSV file) which has its first column called Date. The Date is in the format mm/dd/yyyy. I was trying to get the weekday for these dates and I tried using wday() and day.of.week() functions and both of them gave me precisely the wrong answers. I think the issue lies in the proper formatting of dates. The class of this column is a factor class and hence I