Displaying 20 results from an estimated 10000 matches similar to: "Using register => to let Asterisk register to another softswitch via SIP"
2007 Oct 23
2
register => to let Asterisk register to another softswitch via SIP
Dear Alex;
Thanks alot for your nice help.
This is if I need to let Asterisk register with
another softswitch (so I used register =>), what if I
need asterisk to send call for the softswitch without
register to it (directly)? If I removed the register
=> then how it will distiguish the IP address in the
"host" at the [sip_trunk] is the IP address of the
softswitch that need to
2007 Jul 24
2
SIP IP Trunk, between Asterisk and Softswitch
Dear List;
I am trying to create a link between Asterisk and My
softswitch, the link to be SIP Trunk.
I did the below configuration and I do not know if any
one can help me and advise me to have better
configuration to be sure that link is fine. But I do
not know how to determine the SIP username to be sent
for my softswitch as sometimes the softswitch need to
check it.
Also, does asterisk
2007 Jul 03
5
Determining the used codec for the IP Trunk (SIP Trunk)
Hi List;
Where I determine the codec to be used for the SIP
Trunk (between Asterik and another SIP softswitch)?
Regards
Bilal
____________________________________________________________________________________
Be a better Heartthrob. Get better relationship answers from someone who knows. Yahoo! Answers - Check it out.
http://answers.yahoo.com/dir/?link=list&sid=396545433
2008 Oct 27
11
Fring: Open VPN client to be installed on the mobile, which mobile?
Hi All;
I do not know if anyone faced such case in dealing with open vpn (as we need it for fring to be used from the mobile:
Which mobile can be used to install the open vpn client on it, so we can use it to do a vpn channel with the server that has open vpn server?
Regards
Bilal
2009 Jul 05
1
SIP IP-Trunk to be authenticated based on username and password, not IP address
Hi List;
How can one Asterisk Box A to send a SIP call for another Asterisk Box B, and that call to be authorized based on the username and password, and not on the IP (as the IP address of the source is not known because it keep changing)? I think the trick in the Dial command, how to write it properly in a way that other Asterisk Box can recognize the sip username and password which are existed
2009 May 26
8
Bandwidth management and ADSL router
Hi All;
I discover that most of the voice cutting complain are coming from the Internet bandwidth when we are connecting two remote offices togethor via Asterisk or any other IP PBX.
Anyone has an idea on a ADSL router that work as ADSL + Bandwidth division? So we can resolve the problem of providing a guaranteed bandwidth for the voice packets instead of suffering the voice cutting?
Regards
2008 Feb 27
2
Entering code to restart the machine
Hi All;
How can I configure Asterisk in that way:
If I entered code (from my mobile when I call to the
Asterisk or from any Internal Phone), then the machine
do restart. I need this when I am far from the office
and I need to restart the machine and I do not have
Internet connection.
Any help?
Regards
Bilal
2011 May 05
4
SIP secruity: username and password
Hi All;
When the endpoint register on Asterisk or initiate a call, so they exchange the sip username and password. What is the possibility that this will be capture by the hacker and how to avoid this problem?
Regards
Bilal
2007 Jul 03
2
Putting a password on the international call
Dear List;
To have better security, how can I put a password on
the international calls (if the user dialed the
international call, then it will be asked for password
to send the call outside)?
Can this password read from the CDR file to know whom
did these international calls (using which password?
As I might have mutliple passwords).
Regards
Bilal
2007 Sep 25
5
Do I need to run #modprobe zaptel for Digium
Hi List;
If I am configuring Diguim Analoge card, then I need
to run #modprobe wctdm, but the question why I need to
run #modprobe zaptel also?
What #modprobe zaptel does a things that #modprobe
wctdm does not do?
Any help?
Regards
Bilal
____________________________________________________________________________________
Looking for a deal? Find great prices on flights and hotels
2009 Jun 18
3
asterisk-gui: read/write in the conf files or db
Hi Danny;
Really I did not understand how I can determine if the IO will be DB or conf files? Is it from the Asterisk manager?
Regards
Bilal
-------------------------
It depends on how you are configured. The gui interfaces using Asterisk
Manager, so you get the Same IO from the gui that you would get from a
native manager session.
-----Original Message-----
From: asterisk-users-bounces at
2007 Jun 28
2
Linking Asterisk with another SIP PBX (or SIP Softswitch)
Hi List;
If I need to do a trunk between Asterisk and another
SIP softswitch (so Asterisk will send a SIP calls to
that softswitch), then I have to configure this on the
sip.conf file or where exactly? And is it the same
when I configure iax trunk?
Should I determine the context in this case for this
SIP trunk?
Regards
Bilal
2009 Oct 28
1
The SIP in the Mobile Phones are not able to register on asterisk
I am talking about the SIP.
Now the new mobiles (Nokia, Erecson, Panasonic, iPot, ... etc) all of them support SIP capability. They are able to register to any SIP server (by giving the IP address, username and password). Fring is one of the software that can be installed on the mobile devices and can register on the SIP servers.
BUT, the new mobiles currently come with built in SIP (no need to
2008 Mar 05
6
Asterisk based UNIX
Hi All;
Anyone tried to install Asterisk based on UNIX (not
linux)? Which UNIX was good to work with Asterisk?
Regards
Bilal
____________________________________________________________________________________
Never miss a thing. Make Yahoo your home page.
http://www.yahoo.com/r/hs
2009 Jun 11
2
In Dahdi: what we use instead of /sbin/ztcfg -vv
Hi All;
In dahdi: what we use instead of ztcfg -vv (that is existed /sbin/ztcfg -vv).
?
Regards
Bilal
2011 Jun 14
1
sig_pri.c:985 pri_find_dchan: Span 1: D-chanannel anyway!
Dears;
To patch libpri: I just place the patch file in the libpri source directory and then I run make and make install?
Or I need to compile the dahdi and asterisk also?
If the problem stayed, do I have to go for previous libpri version? Or for previous dahdi version and asterisk version?
Regards
Bilal
-----------
> bilal ghayyad wrote:
> > But I am afraid it is a bug because I
2011 Jun 14
3
sig_pri.c:985 pri_find_dchan: Span 1: No D-channels available! Using Primary channel as D-channel anyway!
Dear;
Thanks a lot for guiding me.
Is it possible that the installation libpri-1.4.11.5 newer than the libpri-1.4.11.5-patch?
Well, when I typed (note: I am trying to apply the libpri-1.4.11.5-patch for the libpri-1.4.11.5):
libpri-1.4.11.5# patch -p0 -i libpri-1.4.11.5-patch
It gave me that patched detected as shown below (example of one file, and I got same for other files):
patching file
2007 Jul 24
10
What is the best softphone work with Asterisk
Hi List;
I need to configure a softphone to be client and use
it with Asterisk, which is the recommended one? Is it
iax2?
Regards
Bilal
____________________________________________________________________________________
Boardwalk for $500? In 2007? Ha! Play Monopoly Here and Now (it's updated for today's economy) at Yahoo! Games.
2007 Jul 27
4
Asterisk Wiki
Hi List;
I am trying to use wiki via the link
(http://www.voip-info.org/wiki/index.php?page=Asterisk)
in effective way to find the needed resource for me,
but still it is hard to arrive for the needed
information.
For example: what is the best (shortest) way to search
for information related to the command playbak()?
Using the backlines, it make the eyes feel hard by
keep reading without
2008 Dec 21
6
Asterisk and Dabatase
Hi All;
Anyone knows if there is an Asterisk version that setup can be stored in Database instead of the configuration files (.conf)?
Any advise?
Regards
Bilal