Displaying 20 results from an estimated 900 matches similar to: "Asterisk registers but won't complete calls."
2004 Jan 05
8
Sip Trunking
Hi list,
I have to connect two asterisk box, in this scenario:
[asterisk1]----sip----[asterisk2]----PSTN
I must use sip, cos we'll use cisco rtp header-compression to save
bandwidth.
Could you tell me the best way to send calls from asterisk1 to
asterisk2, since I cannot use IAX trunking?
Thanks in advance
Eduardo
2013 Nov 12
2
Patch to Set RFC2307 attributes in samba-tool create user <username> --uid-number=501
I'm using sernet samba 4.0.11 on Centos 6 and don't see the capabilities to add some of the RFC2307 attributes that make Linux UID/GID mapping easier in the sernet version of the samba-tool.
The patch is mentioned on this list last year under: https://lists.samba.org/archive/samba/2012-September/169300.html
Some threads on the net refer to this capability found in newer versions of samba
2014 Aug 22
1
Can't hangup channel from CLI
Asterisk 11.11.0 on CentOS 6.5, installed from RPMs. OpenSIPS fronting
Asterisk from a Tekelec T9000.
I'm accumulating stuck channels.
I'm googling now and I recognize that Friday afternoons are the worst time
to ask questions, but I'm getting desperate because this is keeping me
from rolling a system out to production. (Yup, I know. Who rolls out a
system on a Friday
2005 Jul 18
2
Failed to create storage with data - possible reasons?
Hi
I'm getting this error with my attempt at setting up dovecot for virtual
mail accounts:
Failed to create storage with data: /home/vhostpath/usersname/Maildir/
I cant establish any cause. I dont think its permissions as it was
saying 'Permission denied' till I fixed that and the UID and GID are
those of the directories owner. I was prompted bythe log files to set
the minimum and
2014 Jan 14
1
getent passwd & getent group returning UID and GID using Winbind 4.1.x series samba
Just to make sure that I'm on the right path to get this working the way I would like.
I have a linux file server that has used LDAP the user and group information in the past. I would like to migrate (recreate) the same users and groups in the samba4 AD DC, adding the UID and GID attributes. So that I don't have to change the UID and GID permissions on the file servers.
The migration
2019 Aug 05
1
problems with authentication
> -----Oorspronkelijk bericht-----
> Van: samba [mailto:samba-bounces at lists.samba.org] Namens
> Rowland penny via samba
> Verzonden: maandag 5 augustus 2019 9:59
> Aan: samba at lists.samba.org
> Onderwerp: Re: [Samba] problems with authentication
>
> On 05/08/2019 08:24, L.P.H. van Belle via samba wrote:
> > Hai,
> >
> > I think this is an old bug..
2019 Aug 05
3
problems with authentication
On 05/08/2019 08:24, L.P.H. van Belle via samba wrote:
> Hai,
>
> I think this is an old bug.. ( pretty sure about it )
> And i suggest to dont change anything except smb.conf.
>
> Your trying to use kerbereros usersname.
> wbinfo -a marcio at EMPRESA.COM.BR
> Enter marcio at EMPRESA.COM.BR's password:
>
> And you using:
> winbind use default domain = yes
>
2003 Sep 26
4
valid users = %S in rc4
After upgrading rc2 -> rc4 (suse binary packages)
line 'valid users = %S' in [homes] section prevents user getting to his
homedirectory
in logfile smbd says:
[2003/09/25 15:07:59, 2] smbd/service.c:make_connection_snum(384)
user 'xxxx' (from session setup) not permitted to access this share (xxxx)
Hannu
2006 Oct 13
1
Asterisk (meetme) and SMP/HT OK?
In the past, there have been reports of problems with Asterisk with
multiple processors and/or HyperThreading.
I'm having a !@#$ of a problem with an HPDL380 with 2 3.4gHz Xeon
processors, 2 gb RAM -- if I got 24 hours I'd think I had died and gone to
heaven :)
Am I missing something obvious like "Asterisk is single CPU, single core?"
I can't access the ILO so I
2003 May 14
0
CallerID in h323
Hi,
I notice than when I try to send callerID SetCIDName(${CALLERID}). I can't have a caller ID in h323 (i'm using asterisk-h323 drivers) but in voicemail app i can find in msg0000.txt in var/spool/asterisk/vm that the callerchan=H323/21372 and callerID=Unknown.
Is there a way to have callerID like usersname in h323 ?
Regards
Rattana
-------------- next part --------------
An HTML
2008 Jun 22
1
Rsync + crontab centos5.1
Just looking at the "man rsync".
Might as well be duagnosing a plattypus.
I have made a dir on my Cent samba shares to setup a local fedora.repo
(1) How do I get it to run weekly at a certain time. is this correct?
crontab -e 22 7 0 0 /usr/bin/rsync -va
/Fedora-Mirror /local samba share.
(2) Trying to get cron it run 10pm every saturday night.
Log whats happening.
update packages,
2019 Aug 04
5
problems with authentication
Hi,
I set up a samba 4 in Debian 9.9 as a Domain member server, but
authentication is not working as follows:
root at srv-proxy:/etc/samba# wbinfo -a marcio at EMPRESA.COM.BR
Enter marcio at EMPRESA.COM.BR's password:
plaintext password authentication succeeded
Enter marcio at EMPRESA.COM.BR's password:
challenge/response password authentication failed
wbcAuthenticateUserEx(+marcio at
2013 Jun 08
0
Re: [ceph-users] Setting RBD cache parameters for libvirt+qemu
On 06/07/2013 04:18 PM, John Nielsen wrote:
> On Jun 7, 2013, at 5:01 PM, Josh Durgin <josh.durgin@inktank.com> wrote:
>
>> On 06/07/2013 02:41 PM, John Nielsen wrote:
>>> I am running some qemu-kvm virtual machines via libvirt using Ceph RBD as the back-end storage. Today I was testing an update to libvirt-1.0.6 on one of my hosts and discovered that it includes this
2019 Aug 05
0
problems with authentication
P.S.
Test 1, was done with an backend = AD
Just verified the other (older) proxy.
Debian Jessie, samba 4.8.12. ( also a proxy server )
Same result, all work great :-)
Greetz,
Louis
> -----Oorspronkelijk bericht-----
> Van: samba [mailto:samba-bounces at lists.samba.org] Namens
> L.P.H. van Belle via samba
> Verzonden: maandag 5 augustus 2019 10:08
> Aan: samba at
2013 Jun 07
1
Re: [ceph-users] Setting RBD cache parameters for libvirt+qemu
On Jun 7, 2013, at 5:01 PM, Josh Durgin <josh.durgin@inktank.com> wrote:
> On 06/07/2013 02:41 PM, John Nielsen wrote:
>> I am running some qemu-kvm virtual machines via libvirt using Ceph RBD as the back-end storage. Today I was testing an update to libvirt-1.0.6 on one of my hosts and discovered that it includes this change:
>> [libvirt] [PATCH] Forbid use of ':'
2019 Aug 05
0
problems with authentication
Hai,
I think this is an old bug.. ( pretty sure about it )
And i suggest to dont change anything except smb.conf.
Your trying to use kerbereros usersname.
wbinfo -a marcio at EMPRESA.COM.BR
Enter marcio at EMPRESA.COM.BR's password:
And you using:
winbind use default domain = yes
This is and old bug somewhere in 4.5/4/6 i believe.
Only change these, yes only slows down you
2002 Jun 20
1
Newbie login question
I almost afraid to ask - but, I have Samba installed
and operational. When I try to login to http://localhost:901
I get a logon screen. I type root then the password. But it
keeps comming back as bad usersnam or password. I know thjis is
simple. But it's my fist time tyring to use samba and I cannot find any
answers on the internet.
Thanks for your help
2016 Feb 16
3
Password changes and syncing passwords with Linux accounts
On 16/02/16 08:38, Rowland penny wrote:
> You are not going to like this, but I am going to say it anyway:
>
> *Remove* any users that are in AD from /etc/passwd (the same goes for
> groups)
>
> All your users & groups should now only exist in AD, you do not need
> or can have, users & groups in AD *and* /etc/passwd & /etc/group.
>
> Your users will only have
2020 Apr 28
2
Samba update cause windows incorrect password
Hai Rowland,
Well, its based on that i have here.
I run still a mixed setup here. ( 2 different domains )
2 servers 4.1.x as PDC/member on wheezy. (DOMAINA )
4.11.7 as AD-DC's (buster) DOMAINB
All my windows clients login through AD-DC. (DOMAINB\username)
I use the "Passthrough" auth for the shares on the PDC. (DOMAINA\username)
I use GPO's to set the correct domain to
2001 Nov 23
6
Winbind issues
Several questions really (all on the stable 2.2.2 samba compiled with
winbind and acls (and Brandon Stone's recycle bin), with a 2.4.14 kernel
along with acls from acl.bestbits.at on a RedHat 7.2 box)...
1) Does anyone know how to stop the security event log on an NT PDC filling
up with lots of ANONYMOUS accesses to the Security Account Manager eg:
Object Open:
Object Server: Security