similar to: asterisk registered in ser proxy

Displaying 20 results from an estimated 7000 matches similar to: "asterisk registered in ser proxy"

2005 Oct 03
2
Real Life FAX sending receiving
is it possible to achive the following scenario? faxmachine--tdm40bFXS--SIPnetwork--Gateway--faxmachine i have found a lot of documents about asterisk receiving a fax and saving it to a file. But i want to receive the fax via SIP and send it to my faxmachine. I also want to send a fax from my faxmachine through the digium card, so asterisk should send the fax via SIP to the gateway, which also
2006 Jun 15
3
UNIX accounts can create
Anybody know whats wrong when the commands smbldap-useradd or populate work fine with ldap but cant create unix/linux accounts ???? Pelase Help. Jorge __________________________________________________ Correo Yahoo! Espacio para todos tus mensajes, antivirus y antispam ?gratis! ?Abr? tu cuenta ya! - http://correo.yahoo.com.ar
2005 Sep 12
4
is this the correct way to use the mailing list?
don't read this. i'm a complete newbie, and i don't know how to start sending messages. if someone read this, then can answer me also how to delete a file with the console (really ashamed) y know that copy with cp, but delete??? thanks... ___________________________________________________________ 1GB gratis, Antivirus y Antispam Correo Yahoo!, el mejor correo web del
2008 Jun 27
1
Centos 5.2 and Xen, problems installing guests
Hello, I have installed a new server with centos 5.2 x86_64, when i try to install a guest using the gui tool virt-manager the "new" button is disabled, so no good luck. Using virt-install on the command line, the install process begins but after retrieving the .treeinfo vmlinuz and initrd.img files, it stop with the following error: virDomainCreateLinux() failed POST operation
2003 Nov 17
4
The boss will discharge me, I spoiled the system. HELP!
I have a mixture network with WinXP machines and IRIX (UNIX of Silicon Graphics) machines. In the machine with IRIX (O2) there was an old version of samba. It worked well. But recently I've downloaded. I installed this new version, and I spoiled the system. Now I don't know if I have to reconfigure the smb.conf only or if I have to install more pakages or if I have to reconfigure several
2003 Apr 28
4
Hi, I try to use asterisk with PHP. But I can't execute asterisk -r when i am not in root. But I have lauch asterisk in an users mode. I have this message when i try this : ERROR[1024]: File asterisk.c, Line 1222 (main): Unable to connect to remote asterisk Someone konow how to use asterisk in user mode ? Regards Rattana -------------- next part -------------- An HTML attachment was
2005 Aug 31
2
system reboots after shutdown
Hi all, When i want to shutdown my laptop (the result is the same from command line as from gdm), screen gets blank, but computer restarts. APM is disabled (this laptop doesn't support it), and disabling ACPI is no solution, because it controls the fan. Kernel version is 2.6.9-11.EL and CPU is Pentium Centrino. Laptop is an AIRIS 840. I use different distros (ubuntu, debian and
2004 Jul 27
2
[LLVMdev] Linking to native libraries
Hi! I want to know if it is possible to link llvm object files with native static/shared libraries. I mean: without using the provided c/c++ frontend to compile first the sources of the libraries to llvm and then -everything being llvm- linking. For example, I would like to compile XLanguage to llvm and then link the resulting object against libXRuntime.so. If this can be done, could you give me a
2005 Jun 07
3
Problem with Notes on Debian Wine
For a while now I have had a problem running Notes on Debian Wine. Most of the time it runs just fine, but whenever I try to open a mail document which has an attachment Notes just terminates. I have the log and the relevant bit seems to say:- err:syslevel:_CheckNotSysLevel Holding lock 0x41311700 level 3 wine: Unhandled exception (thread 0009), starting debugger... WineDbg starting on pid 0x8
2004 Jul 27
0
[LLVMdev] Linking to native libraries
On Tue, 27 Jul 2004, [iso-8859-1] Carlos Pita wrote: > I want to know if it is possible to link llvm object files with native > static/shared libraries. Absolutely, we do this routinely. > I mean: without using the provided c/c++ frontend to compile first the > sources of the libraries to llvm and then -everything being llvm- > linking. For example, I would like to compile
2004 Nov 22
2
dtmf tones during conversation
I have a * box running our house and on one extension we are getting spurious DMTF tones during conversations. It only happens on one of the 3 FXS ports and it's the one w/ a cordless phone on it. At first I thought someone was being careless and just hitting a button on the other end of the line, but it's happening too much for that... Has anyone run into this before? -- -M There
2008 May 19
6
Sample Code, quick simple openid auth
You''ll need to install the ''openid'' gem for this, and require it in your camping app: class Login < R ''/login'' def get this_url = ''http:'' + URL(''/login'').to_s unless input.finish.to_s == ''1'' # start doing the auth here begin
2005 Jul 24
3
K3b or another alternative for CentOS 3.5?
Hi all, Somebody knows any application (gui if it is possible) to write CDs under Centos 3.5??. Thank you very much. __________________________________________________ Correo Yahoo! Espacio para todos tus mensajes, antivirus y antispam ?gratis! Reg?strate ya - http://correo.espanol.yahoo.com/
2007 Apr 19
2
Help with Windows Installation
Hi, I'm a beginner on VPN's World. I think TINC is a solution for me. I want to connect thru Internet 2 different locations, both networks are Windows based. I downloaded TINC Installer for Windows and followed Installation Guide step by step, everything is ok but when I tried to run TINC Deamon a message it's displayed said: "The services has started and finished immediately
2005 Dec 20
1
from Colombia - help
Hi, my name is Andres Felipe Barrientos, I'm a student of Statistic and don't speak in english. En mi trabajo de grado necesito implementar la funcion smooth.spline y necesito saber con que tipo de spline trabaja (b-splines o naturales). Ademas me gustaria saber cual es la base que se usa para encontrar estos splines, por ejemplo, cosenos, senos, polinomios entre otros.... Otra pregunta
2006 Feb 02
1
Significance of degrees of freedom in nlme
Dear Dr. Bates, Thank you very much for your response. I had consulted the algorithm described in Pinheiro and Bates. However, what I don't understand (among other things) is why my two parameters appear to be estimated at different grouping levels (based on the DF values). Affect this different values of DF at the estimates parameters? The estimates fixed effects were get at the same level of
2003 Jun 11
4
some sip questions AGAIN
I write the email again, the third time!!, cause the other two ones, I have had problems while sending them. I hope this time it works. Here is the email again: Hi (and sorry) everybody I'm starting with SIP and I wanted to ask some questions, perhaps silly ones, but I hope people can answer me! 1) Which codecs may I use? I want the SIP phones to call to the PSTN above all, but I have
2005 Oct 09
1
Can't see Samba Server from Win2k
I've read other posts on this, but can't figure out what I'm doing wrong. I have Suse 8.0, Samba 2.2.3a, and Win2k. Win2k Setup: workgroup = HOME_NET Host Name = Copernicus IP : 192.168.0.7 Subnet : 255.255.255.0 Def Gateway: 192.168.0.1 smb.conf (comments removed): ======================================================= [global] workgroup = HOME_NET netbios name = gallileo
2005 Jun 29
7
4.1 beta for Alpha platform
Hi all, I have tried to install this beta release on PWS 433 au but I can not boot /kernels/vmlinux.gz image. Error is: "unsupported compressed image". Is not posible to install under this Alpha model?? Thank you. __________________________________________________ Correo Yahoo! Espacio para todos tus mensajes, antivirus y antispam ?gratis! Reg?strate ya -
2005 Oct 10
2
centos on 64M 350Mhz pentimum II
All, I have an old computer 64M 350Mhz pentium II. centos os 4.1 installs on it fine. however on boot it says low memory and it kills certain processes. httpd or sendmail. I have a 2GIG swap and I did a chkconfig XXX off on a few things like xfs, nfs, httpd, kudzu. My old 2.4 kernel used to run in 4M with a swap... I had recompiled the kernel (took a while) to enable the cyclades module. Any