Displaying 20 results from an estimated 2000 matches similar to: "Fitting Maximums of data series with cubic spline"
2010 Apr 21
4
Converting daily data series to monthly series
Hi Users,
I have daily series of data from 1962 - 2000, with the data for February
29th in leap years excluded, leaving 365 daily values for each year. I
wish to convert the daily series to monthly series. How can I do this using
the zoo package or any other package?
Thanks
ZABLONE OWITI
GRADUATE STUDENT
Nanjing University of Information, Science and Technology
College of International
2010 May 12
2
How to extract sum of particular months in a monthly data series
Dear Users,
I have a monthly data for a number of years(1960-2007) for a number of
stations and i wish to extract sesonal time-series for the months of
March-May and October-November for very station. I have read this data with
read.table in R with stations as columns and time (months) as rows. My
attempt to aggregate with the zoo package using the function as.yearqtr
failed since this sums
2010 May 27
3
How to combine data columns to a single column
Dear users,
I have several columns of data (each column containing monthly data for a
particular year from january - december) . I would wish to combine the
columns to get a Single column of continuous data as shown in (b) below. I
have read this data as table in R
(a) Data example
Year 1903 1904 1905 1906 Jan 125.0 30.0 113.0 5.0 Feb
128.0 100.0 70.0 388.0
2010 May 07
2
How to re-arrange data in R
Dear users,
I have monthly station data (44) stations data for 45 years which I have
read in R using read.table. the data is in the format:
Year Month Station1 Station2 ......................................
Station 44 (i.e the column names in the 1st row), I also have the
latitude and longitude of the stations in a separate file in R (in the
format : Station LAT LON).
I wish to
2010 Apr 11
1
Adding country boundaries on field map plots
Hi R users,
What is the command for adding (or how do we add) country boundaries on
r-spatial plots.
Thanks
ZABLONE OWITI
GRADUATE STUDENT
Nanjing University of Information, Science and Technology
College of International Education
Add: 219 Ning Liu Rd, Nanjing, Jiangsu, 21004, P.R. China
Website: www.nuist.edu.cn
====================================================
[[alternative
2011 May 21
1
Confidence Interval of Specral Density Plot
Dear Users,
I wish to know at what confidence level is the confidence interval
provided in the Spectrum function (plot.spec) plots.
The only information provided in the help regarding this is : a confidence
interval will be plotted by plot.spec: this is asymmetric, and the width of
the centre mark indicates the equivalent bandwidth.
Attached is an example plot with the BLUE confidence
2010 Apr 04
1
Adjusting X-axis time scale
Dear all,
I am plotting daily data from 1950 to 2000 and I wish to have the time in
X-axis to indicate years and NOT days (i.e 1950 1951,......,2000 instead of
1,2, 3, ......).
How do I set the x-axis to show years instead of days.
ZABLONE OWITI
GRADUATE STUDENT
Nanjing University of Information, Science and Technology
College of International Education
Add: 219 Ning Liu Rd, Nanjing,
2010 Apr 09
1
How to get the penalty matrix for natural cubic spline?
Hi, all
I am trying to get the basis matrix and penalty matrix for natural
cubic splines. In the "splines" package of R,"ns" can
generate the B-spline basis matrix for a natural cubic spline. How can
I get the basis matrix and penalty matrix for natural cubic
spline.
Thanks a lot!
Lee
[[alternative HTML version deleted]]
2013 Mar 06
1
Constrained cubic smoothing spline
Hello everone,
Anyone who knows how to force a cubic smoothing spline to pass through a particular point?
I found on website someone said that we can use "cobs package" to force the spline pass through certain points or impose shape constraints (increasing, decreasing). However, this package is using B-spline and can only do linear and quadratic
2012 Dec 01
3
cubic spline
Hallo,
I'm facing a problem and I would really appreciate your support.
I have to translate some Matalb code in R that I don't know very well but I
would like to.
I have to interpolate 5 point with a cubic spline function and then I expect
my function returns the Y value as output a specific X value inside the
evaluation range. Let's suppose that:
1- *X = [-10, -5, 0, 5, 10]*
2
2011 Oct 11
1
restricted cubic spline within survfit.cph in the package rms
Hello,
does anyone have an example on how to use restricted cubic
splines function rcs within survfit.cph, if cph (Cox Proportional Hazard Regression) was done with restricted cubic
splines (which I made to work)?
Thank you.
>
[[alternative HTML version deleted]]
2010 May 14
1
Cubic B-spline, how to numerically integrate?
(corrected version of previous posting)
I fit a GAM to turtle growth data following methods in Limpus & Chaloupka
1997 (http://www.int-res.com/articles/meps/149/m149p023.pdf).
I want to obtain figures similar to Fig 3 c & f in Limpus & Chaloupka
(1997), which according to the figure legend are "expected size-at-age
functions" obtained by numerically integrating
2011 Nov 22
0
plotting output from LME with natural cubic spline
I have used LME to fit a mixed effects model on my data. The data has
274 subjects with 1 to 6 observations per subject. Time is not linearly
associated with the outcome, so I used ns to fit a natural cubic spline
with 3 auto knots. Subject and the natural cubic time of spline are both
treated as random effects. This model has run without any problem, but
now I would like to plot trajectories for
2008 Oct 10
1
how to evaluate a cubic Bezier curve (B-spline?) given the four control points
I'm trying to use R to determine the quality of a cubic Bezier curve
approximation of an elliptical arc. I know the four control points
and I want to compute (x,y) coordinates of many points on the curve.
I can't find anything in either the base distribution or CRAN that
does this; all the spline-related packages seem to be about *fitting*
piecewise Bezier curves to a data set.
2007 May 21
2
comparing fit of cubic spline
I want to compare the fit of a quadratic model to continuous data, with that
of a cubic spline fit. Is there a way of computing AIC from for e.g. a GAM
with a smoothing spine, and comparing this to AIC from a quadratic model?
Cheers
******************************************
Tom Reed
PhD Student
Institute of Evolutionary Biology
102 Ashworth Laboratories
Kings Buildings
University of
2004 Nov 10
2
cubic spline/smoother with nlme
Greetings, I would like to use a cubic spline
or smoother to model the fixed effects within
nlme. So far the only smoother I have been able
to get to run successfully in nlme is smooth().
I tried smooth.spline:
fixed=list(lKa~1,lCL~smooth.spline(BSA, df=3))
the error I got was the following.
Error in model.frame(formula, rownames, variables, varnames, extras,
extranames, : invalid
2010 Sep 26
1
Basis functions of cubic regression spline in mgcv
I have a question about the basis functions of cubic regression spline in
mgcv. Are there some ways I can get the exact forms of the basis functions
and the penalty matrix that are used in mgcv? Thanks in advance!
Yan
[[alternative HTML version deleted]]
2013 Nov 01
0
Impose constraint on first order derivative at a point for cubic smoothing spline
Hello,
Dr. Simon Wood told me how to force a cubic spline passing through a
point. The code is as following. Anyone who knows how I can change the code
to force the first derivative to be certain value. For example, the first
derivative of the constrained cubic spline equals 2 at point (0, 0.6).
I really appreciate your help!
Thanks!
Best
Victor
2018 Mar 23
1
restricted cubic spline in FGR function
Dear Thomas,
I want to use evaluate effect of Age using restricted cubic form in the FGR function as
Fgr.crr <- FGR(Hist(time, event) ~ rcs(Age_years), data=dat)
It provides error. " Error in parse(text = termtext, keep.source = FALSE): .... 1: response ~ rcs(Age_years
Do I need to change any of the R code?
Regards
Amalraj Raja
The University of Aberdeen is a charity
2009 Apr 15
0
How to use cubic spline coefficients from termstrc package?
Hi,
I'm using the cubic splines from termstrc package. I invoked the
splines_estim function with a group of 43 bonds. It computes 6 knot points
and returns values for alpha1 to alpha7. My question is how to use these
alpha1 to alpha7 in the equation of yield? For example, if I'm trying to
find the yield at, say, 12.25 years, which falls between 3rd & 4th knot
points what should the