Displaying 20 results from an estimated 100 matches similar to: ""Contact header appears incorrect on this invite" Asterisk registering with another PBX"
2010 May 07
0
SIP REGISTER header not containing Allow-Events or Allow
The SIP trunking service that I am trying to set up keeps saying that my
registration from Asterisk is invalid.
Asterisk registration:
REGISTER sip:{registration_ip} SIP/2.0
Via: SIP/2.0/UDP {asterisk_ip}:5060;branch=z9hG4bK5c2eb10c;rport
Max-Forwards: 70
From: <sip:{registration_user}@{registration_ip}>;tag=as5579cc0c
To: <sip:{registration_user}@{registration_ip}>
Call-ID:
2010 May 20
1
Drive becomes unusable with "The group name could not be found"
Out of nowhere the share "neil share" disappeared for one user and the
user got the error "The group name could not be found". The user was a
part of the group that was necessary to access the share. Just
restarting the samba services allowed the users to get back in to the
share. Not sure what the issue was until then... Samba version 3.5.2.
smb.conf (with omits)
[global]
2004 Oct 18
3
答复: R plot problems
Thank you for your help!
I gave you an example, you could run it in R . Maybe you will understand my meaning clearly.
x <- data.frame(main.name="AAA", x.name=rep(c("Apply","Watermelon","Lemon","Banana",
2004 Oct 18
2
答复: 答复: R plot problems
Yes! You are right ! It is perpendicular to the axis.
Thank you very much!
Could I choose the angle ,such as 45 degree?
Best Regards!
Ivy Li
YMS in Production & Testing
Semiconductor Manufactory International(ShangHai) Corporation
#18 ZhangJiang Road, PuDong New Area, Shanghai, China
Tel: 021-5080-2000 *11754
Email: Ivy_Li at smics.com
-----orig---
Hi Ivy,
How about
x <-
2008 Sep 26
1
Using functions that contain sums
Hello,
I'm trying to perform an integration on a function that contains a sum.
Similarly I'm hoping whatever acts as a fix will be good enough to aid in
a 2nd case as well but I've already put in a work-around for that
situation.
My code example is here:
watermelon=c(0,1,2,3)
w<-function(x){
sum(sin(x-watermelon))}
integrate(function(x){w(x)},0,2)
2010 Apr 13
2
Samba over VPN
Have a 2003 server located outside of the Domain network over a VPN.
The server originally existed inside the network (10.1.1.0/24) but now
exists on 10.10.12.0/24. I can access shares over the VPN to the domain
controller, but when I try to log in as a domain user it says the domain
is unavailable.
I added the domain controller as a WINS server on the 2003 server.
nbtstat -c on the 2003 does
2004 Oct 18
1
How to draw x-axis time label.
Hi everybody,
Could I consult one problem?
It is about plot
Now I do some analysis in plot . I need to draw a plot which x-axis is time . But when I run the funtion of plot . The x-label are very oddness number, such as the time is "2004-08-05 09:08:48", but the x-label is 1091800000. I don't know how to do .
I have an example . Mybe It can explain my meaning clearly.
Thank
2004 Oct 18
2
答复: How to draw x-axis time label.
Thank you for helping me!
I try the "pretty" funtion to select the x-axis position value.Then I use the "format" funtion.
xax.pos <- pretty(as.numeric(x$x.name))
format(xax.pos,'%d %b %y')
> xax.pos
[1] 1091600000 1091800000 1092000000 1092200000 1092400000 1092600000 1092800000
[8] 1093000000
There are something wrong. I found the xax.pos has been changed to
2010 May 21
0
FollowMe dials numbers but can't confirm the call or hear anything
Trying to do a FollowMe test. When the extension is dialed, it dials my
cellphone and my cell phone rings. But when I answer my cell phone it's
just silence. When I press '1' on my cell phone, nothing happens.
extensions.conf:
exten => 140,1,FollowMe(mleonetti)
followme.conf
[general]
featuredigittimeout=>5000
takecall=>1
declinecall=>2
2015 Mar 30
0
WaitForSilence NEVER detects silence,,Post
I have a call server that runs on a few custom AGI scripts initiating
calls and then managing the calls. I'm getting stuck on the detecting
silence functions. I wanted to use the silence detecting as a quick
method of substituting Answering Machine Detection.
However, whenever WaitForSilence is supposed to be detecting silence, it
always just ends the interval whether or not there is
2015 Mar 30
0
WaitForSilence NEVER detects silence
I have a call server that runs on a few custom AGI scripts initiating
calls and then managing the calls. I'm getting stuck on the detecting
silence functions. I wanted to use the silence detecting as a quick
method of substituting Answering Machine Detection.
However, whenever WaitForSilence is supposed to be detecting silence, it
always just ends the interval whether or not there is
2010 Apr 29
1
212GB log file generated for a workstation
Had a server fill up completely with a samba workstation log file. The
log file repeatedly had this information
[2010/04/29 04:00:01, 0] smbd/notify_inotify.c:inotify_handler(240)
No data on inotify fd?!
about a billion times.
In my smb.conf Ihave max log size = 50 set, so I was hoping the log file
wouldn't get that big.
2010 Mar 26
1
SMBLDAP tools reports "modifications require authentication at /usr/sbin//smbldap_tools.pm" but manually command works.
Every time I try and join a Vista system to the domain I get this error
in the log:
[2010/03/26 15:18:58, 0] smbd/service.c:make_connection(1191)
april (192.168.1.194) couldn't find service public
Error: modifications require authentication at
/usr/sbin//smbldap_tools.pm line 1083.
[2010/03/26 15:19:16, 0] passdb/pdb_interface.c:pdb_default_create_user(329)
_samr_create_user: Running the
2010 Feb 19
2
Virtual machine timing (KVM)
To get MeetMe working properly, I know some sort of timing device
provided by the zaptel package is required (even if it means the
zt_dummy). But, on a virtual machine I know that the Linux timing won't
work as expected. Is it possible to then dedicate a physical device
like a USB port or something to the virtual machine to use for the
timing interrupts?
Thanks.
2010 Feb 26
1
SPA941 WMI not lighting up when natted
I have an a bunch of SPA941 Linksys phones for users in and out of the
office. When the phones are in the office (and on the same network as
the asterisk server) the WMI goes on when it should and off when it
should. But when the phone is on another network and natted it fails
to do so. The light always stays off. Has anybody had a similar
problem (and hopefully a resolve)?
2010 Apr 30
3
The user name could not be found when joining a samba domain
Using LDAP and the smbldap-tools. When attempting to join the domain with an administrative user, the computer gets added to the Computers list in LDAP with the following attributes:
cn: workstation75$
description: Computer
gecos: Computer
gidNumber: 515
homeDirectory: /dev/null
loginShell: /bin/false
objectClass: top, account, posixAccount
uid: workstation75$
uidNumber:
2004 Jun 24
0
Ptruvfcc H_y_d_r_0_c_0_d_0_n_e, pain medicati0n available
dettimre copem fntpak
Enjoy deep discount meds here.
Vi-co-din - 0rder Meds From Home Now
Go to our site for more information, so we can help you with all your
prescription needs.
S M http://t.info.shopblack.com/abc/big/
If you would like to discontinue receiving messages of this type, please
use this:
http://vu.info.shopblack.com/abc/big/rf.html
A man was travelling abroad in a
2006 Apr 14
0
Gruff on Windows
Has anyone achieved a stable deployment of Gruff with Rmagick on Windows?
I''ve been playing around with this on Instant Rails and after installing the
RMagick win 32 gem (local gem install as per instructions on web) and then
Gruff on top of that. I did a test controller method that rendered the fruit
pie chart as per the examples on the gruff site. This worked. However, when
I refreshed
2007 Feb 28
1
hi guys problem with running gruff
Hi guys i am pretty much a newbie to rails and tried to install gruff and
run the example given in home page for gruff
i am using ubuntu and dapper.
first i got two errors when i used this example
#!/usr/bin/ruby
require ''rubygems''
require ''gruff''
g = Gruff::Line.new
g.title = "My Graph"
g.data("Apples", [1, 2, 3, 4, 4, 3])
2007 Jun 19
0
toilet
OTCPicks.com Picks SREA As The Stock to Watch. UP 272% In 7 Days!
Score One Inc.
SREA
$0.30 UP 20% Today
Up another 20% today and over 272% in the last 7 days, OTCPICKS.com puts
SREA on their watch list. Read up and get on SREA first thing Wed!
Didn't know it was that much. Other methods are too dangerous when it
comes to fishtailing vehicles and heavy winds. You can buy them over the